Bridge Construction Haidenaabbrücke
Bridge construction of a large bridge in composite steel design: 3,392.40 m² bridge area; bridge cross-section as a two-web slab girder made of welded steel box girders with shear connectors, covered with precast concrete slabs as permanent formwork and supplemented with 22 cm in-situ concrete; width between the irritation protection wall 11.00 m; spans 26.40 m + 32.00 m + 25.00 m + 10 x 22.50 m; total length between end supports 308.40 m; opaque irritation protection wall inclined at 10:1 and 1.60 m high, wall area approx. 1,040.00 m²; approx. 500 m bored pile foundation with ø 1.20 m, bored piles between 7.00 m and 13.00 m; approx. 4,300.00 m² sheet piling remains; approx. 800 t structural steel for the steel box girders; 12 piers; 2 abutments; road construction works with approx. 140 m² asphalt paving.
CONTRACTING AUTHORITY
CLASSIFICATION
Procedure Type
Open Procedure
Contract Type
Works
Main CPV
45221111, Road bridge construction work.
ADDITIONAL DETAILS
EU Funded
Yes
Suitable for SMEs
No
Electronic Submission
Required
Legal Basis
32014L0024
DEADLINES & TIMELINE
Submission Deadline
65 days remaining(LOT-0000)
Published