Electrical Works for New Construction Forstzentrum Nord, Eschenbach
Electrical works for the new construction of Forstzentrum Nord in Eschenbach: approx. 7,500 m installation cable NYM-J 3x2.5 - 5x16, approx. 65 circuit breakers 230/400VAC B 10A, approx. 77 circuit breakers 230/400VAC B 16A, approx. 29 residual current devices, 1 fire alarm control panel with 72h bridging time, approx. 50 m² heating mat (concrete/rolled asphalt, 300W/m², 400 V), 1 distribution cabinet (floor-standing) for 19-inch component installation, approx. 140 plus-sorted glass-glass photovoltaic modules, approx. 4 emergency exit luminaires with single battery and compact housing, approx. 14 safety luminaires with single battery and compact housing, approx. 79 LED moisture-proof surface-mounted luminaires, approx. 188 m support rail system for light band mounting.
CONTRACTING AUTHORITY
CLASSIFICATION
Procedure Type
Open Procedure
Contract Type
Works
Main CPV
45311200, Electrical fitting work.
ADDITIONAL DETAILS
EU Funded
Yes
Suitable for SMEs
No
Electronic Submission
Required
Legal Basis
32014L0024
DEADLINES & TIMELINE
Submission Deadline
16 days remaining(LOT-0000)
Published