Construction of a grade-separated two-level intersection between Justynów and Janówka

Notice title: BUDOWA BEZKOLIZYJNEGO SKRZYŻOWANIA DWUPOZIOMOWEGO POMIĘDZY MIEJSCOWOŚCIAMI JUSTYNÓW I JANÓWKA”

Status
Active
Submission Deadline
37 days remaining
Contracting authority
Location
Andrespol, Poland
Procedure
Open Procedure · Works
Category
Roadworks.Building demolition and wrecking work and earthmoving work.Construction, foundation and surface works for highways, roads.
Published
Reference
ted-635888-2026

Design and construction of a grade-separated two-level intersection between Justynów and Janówka: Preparation of complete project documentation and execution of construction works under a "design and build" system for a grade-separated intersection with railway lines No. 17 (Łódź Fabryczna – Koluszki) and No. 25 (Łódź Kaliska – Dębica) in the form of a road viaduct over PKP tracks along the newly designed ul. Główna, and a tunnel for pedestrians and cyclists along the existing ul. Główna; liquidation of the existing level crossing category A No. 017 016 046 located at km 16+046 of railway line No. 17 and at km 21+056 of railway line No. 25, including associated infrastructure and adaptation of the railway traffic control system; reconstruction of existing platforms at Justynów station and provision of access from the planned tunnel to the platforms via stairs and ramps; expansion and reconstruction of the adjacent road system (ul. Główna, ul. Lokatorska, ul. Graniczna, ul. Rumiankowa) including the construction of sidewalks, parking spaces, and road lighting; demolition, construction, and/or reconstruction of conflicting underground and above-ground utility networks (electrical, telecommunications, traction, gas, water, sewage networks); construction of technological ducts; construction of drainage for the planned road system (including a power generator for the water pumping station), engineering structures, platforms, and track systems; removal of trees and shrubs conflicting with the investment and execution of compensatory plantings; obtaining all necessary administrative decisions on behalf of the contracting authority, particularly the decision on permission for road investment implementation (ZRID), environmental decisions, water permits, and other legally required approvals, agreements, and opinions; further items as per the tender documents.

Free

Never miss a tender again

We send you 3 current matches that fit your company.

We call you once briefly to sharpen your search profile.

No account neededReply in 1-2 business days

By submitting, you agree that Patterno sends you matching tenders by email. Free, unsubscribe anytime. Privacy policy


Tender documents

  • Portal — LOT-0001NON-RESTRICTED-DOCUMENT
  • TED HTML — 635888-2026HTML
  • TED PDF — 635888-2026PDF
  • TED XML — 635888-2026XML
Free

Unlock documents for free

Enter your email address. If you confirm, we will also send you 3 similar tenders.

We call you once briefly to sharpen your search profile.

No account neededReply in 1-2 business days

By submitting, you agree that Patterno sends you matching tenders by email. Free, unsubscribe anytime. Privacy policy


Additional details

EU Funded
Yes
Suitable for SMEs
Yes
Electronic Submission
Required
Legal Basis
32014L0024
Live webinar

See Patterno work on a real tender

45 minutes live, questions answered in the chat. Upcoming dates on the signup page.

  • Matches from 4,500+ portals in one workspace
  • Qualify any tender against your criteria in minutes
  • Prepare bid documents from your company context

Prefer a private session?