Formation water re-injection services for natural gas storage facilities
Formation water re-injection services for natural gas storage facilities: Re-injection of formation water generated during operation at 247 CH wells into the original aquifer for Magyar Földgáztároló Zrt. at the Zsanai, Hajdúszoboszlói, Pusztaedericsi, and Kardoskúti natural gas storage facilities. Expected annual maximum quantities are 15,000 m³ (Zsanai), 10,000 m³ (Hajdúszoboszlói), 2,500 m³ (Pusztaedericsi), and 600 m³ (Kardoskúti). Expected daily maximum quantities are 350 m³ (Zsanai), 150 m³ (Hajdúszoboszlói), 100 m³ (Pusztaedericsi), and 10 m³ (Kardoskúti). The expected maximum total quantity of formation water to be extracted is 84,300 m³. Contract duration from January 1, 2027, to December 31, 2029. Estimated net value: 300,000,000.00 HUF. Detailed technical content and contractual conditions are included in the tender documents.
Missed this tender?
This deadline has passed. So it does not happen again: we send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 495677-2026HTML
- TED PDF — 495677-2026PDF
- TED XML — 495677-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.