Electrification of the Szombathely-Kőszeg Railway Line

Electrification of the Szombathely-Kőszeg railway line: Construction of an alternating current single-phase railway overhead line system for a single-track branch line over approximately 17 track-kilometers on railway line No. 18, designed for 25 kV, 50 Hz, and an approved speed of 80 km/h. This includes the reconstruction and modification of 15 railway level crossing barrier systems and signaling systems due to electrification, including necessary track modifications. Furthermore, the required modification and expansion of GYSEV signaling systems, traffic control systems (KÖFE, KÖFI), railway area lighting, and railway telecommunication facilities are part of the scope. The power supply for the overhead line system of line 18 will be established by modifying the existing 25 kV – 50 Hz railway overhead line system at Szombathely station. Also required are plans (overhead line, lighting) for integration into the GYSEV FET system, the installation of one 100 kVA pole transformer at Kőszeg station, and the complete execution of modifications in non-railway telecommunication and power networks at 16 locations due to electrification. The works must comply with interoperability technical specifications (ÁME). Planning for construction and temporary facilities, as well as the preparation of as-built plans, are also included. The procedure involves activities requiring a building permit.

CONTRACTING AUTHORITY

Name

Győr-Sopron-Ebenfurti Vasút Zártkörűen Működő Részvénytársaság

City

Sopron

Country

HU

CLASSIFICATION

Procedure Type

Open Procedure

Contract Type

Works

Main CPV

45234160, Catenary's construction works.

Other CPV

45231600, Construction work for communication lines.

45232332, Ancillary works for telecommunications.

45233292, Installation of safety equipment.

45234116, Track construction works.

45314000, Installation of telecommunications equipment.

71300000, Engineering services.

71320000, Engineering design services.

ADDITIONAL DETAILS

EU Funded

Yes

Suitable for SMEs

Yes

Electronic Submission

Required

Legal Basis

32014L0025

DEADLINES & TIMELINE

Submission Deadline

4 days remaining

(LOT-0001)

Published

TENDER DOCUMENTS

4 days remaining

Similar Tenders

Explore CPV 45

Supply of impregnated sleepers, bridge timbers, and wooden dowels for GYSEV Zrt.

Supply of impregnated sleepers, bridge timbers, and wooden dowels: Materials for maintenance and renovation works of GYSEV Zrt. to maintain railway operation safety, divided into two lots.

Győr-Sopron-Ebenfurti Vasút Zártkörűen Működő Részvénytársaság

·Sopron
Deadline:August 24, 2026

Brake Pads and Brake Shoes for Railway Vehicles

Supply of brake pads and brake shoes for railway vehicles under a framework agreement. The framework agreement for various disc brake pads has a volume of net 218,570 EUR, of which net 168,200 EUR must be called off. Expected quantities for brake pads: Becorit BM 40 (40 sets), Becorit 918 (2,500 pairs), Becorit B36 (425 pairs), Becorit B66 (1,000 pairs). The framework agreement for cleaning brake shoes has a volume of net 91,770 EUR, of which net 70,600 EUR must be called off. Expected quantity for cleaning brake shoes: L7903/60 (1,200 pieces). Delivery of the products is to the place of performance.

Győr-Sopron-Ebenfurti Vasút Zártkörűen Működő Részvénytársaság

·Sopron
Deadline:July 30, 2026

Timber Construction Services for New Building

Timber construction services in the new building area above the 1st floor reinforced concrete slab: Walls as timber panel walls (prefabricated parts), ceilings as CLT ceiling construction, partly with ribs. Cladding of the timber panel walls with gypsum fiber boards inside and outside. Ceilings rest on columns and beams made of laminated veneer lumber or glulam. Consideration of static specifications from released position plans of the execution statics, as well as integrated own factory and assembly planning into the execution planning. Thermal insulation and sound insulation requirements are to be considered. Areas for temporary site setup and and use as intermediate storage for accumulating material are available; water, electricity, and sewage connections are provided through a separate award for central site facilities. Main services for the 2nd to 4th floor include factory and assembly planning as well as cutting planning for all timber components; manufacturing, delivery, and assembly of timber panel walls including cladding; manufacturing, delivery, and assembly of columns, main and secondary beams made of laminated veneer lumber or glulam; manufacturing, delivery, and assembly of CLT ceilings with and without ribs including re-anchoring to reinforced concrete components.

ringberlin Halle 2 Projektgesellschaft GmbH

·Berlin
Deadline:August 26, 2026

Successive Maintenance Work on Electrical Installations

Maintenance work on electrical installations: successive execution.

Institut »Jožef Stefan«

·Ljubljana
Deadline:August 27, 2026

Find matching tenders automatically

With Patterno-HIT, receive relevant tenders daily, automatically filtered to your company profile.

Book Demo Now