Electrical Systems for New Construction of 'Future Kids' After-School Care Center Mueßer Berg
Electrical Systems: New construction of the entire electrical system, including telecommunications and information technology systems, a meter system with transformer measurements for the house connection, PV system, and emergency power system, as well as three sub-distributions with surge protection. Laying of approx. 20,000 m of cables of various cross-sections and installation types; installation of approx. 500 installation devices such as Schuko sockets, switches, connection boxes. Lighting system inside and outside the building with approx. 300 luminaires. Equipping the building with a house alarm system, intruder alarm system, electrical locking system, and intercom system. Installation of a structured data network with a central data cabinet and approx. 50 data double sockets (approx. 1,700 m of cable). Installation of a public address system (ELA) with loudspeakers for announcements. Installation of controls, cabling network (approx. 1,500 m), and operating buttons for window sun protection systems.
CONTRACTING AUTHORITY
Name
Zentrales Gebäudemanagement Schwerin, Eigenbetrieb der Landeshauptstadt Schwerin
City
Schwerin
Country
DE
CLASSIFICATION
Procedure Type
Open Procedure
Contract Type
Works
Main CPV
45310000, Electrical installation work.
ADDITIONAL DETAILS
EU Funded
Yes
Suitable for SMEs
Yes
Electronic Submission
Required
Legal Basis
32014L0024
DEADLINES & TIMELINE
Submission Deadline
17 days remaining(LOT-0001)
Published