Electrical engineering for complete renovation of Pestalozzischule Zeitz
Electrical engineering: 1 current transformer and meter cabinet (400 A), 1 low-voltage main distribution board (800 A), 16 sub-distribution boards (250 A), 1 central battery system, approx. 219 safety emergency lights, approx. 1,258 installation devices, approx. 548 luminaires, 1 house alarm system (central unit, 120 automatic smoke detectors, 42 push-button detectors, 23 optical signal generators), 3 smoke and heat exhaust ventilation systems (central unit, smoke switches, push-button detectors and wind/rain sensors), 2 stand-alone data distributors (approx. 350 data ports Cat. 6A), 6 door intercoms, 1 clock system (1 master clock and 57 slave clocks), 2 public address systems (central unit technology, players, microphone and loudspeakers), 1 scoreboard, 1 voice alarm system (central unit technology, 1 speaking station and 244 loudspeakers), 2 disabled emergency call systems (central unit, pull cords and service room unit), approx. 56,000 m power/low-voltage cables without integrated functional integrity, approx. 3,450 m power/low-voltage cables with integrated functional integrity, laying systems (approx. 400 m cable trays and UF-duct, approx. 150 m climbing ladders, approx. 3,480 m pipes and ducts), DALI project planning, programming, and documentation.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0000NON-RESTRICTED-DOCUMENT
- TED HTML — 552502-2026HTML
- TED PDF — 552502-2026PDF
- TED XML — 552502-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.