Earthworks for the B 25 Dinkelsbühl Bypass
Earthworks for the construction of the B 25 Dinkelsbühl bypass: topsoil works 48,000 m³; loosening, loading, and installing soil approx. 210,000 m³; soil improvement approx. 185,000 m²; binder for soil improvement approx. 3,500 t; plastic shafts approx. 28 units; precast shafts approx. 22 units; piggyback lines approx. 3,400 m; plastic pipelines DN 150 to DN 300 approx. 960 m; reinforced concrete pipelines DN 300 to DN 800 approx. 480 m; vitrified clay pipelines DN 150 to DN 200 approx. 250 m; gravel sub-bases, 20 to 35 cm, 20,800 m²; asphalt works (surface and base course) approx. 2,100 m²; disposal of contaminated soil approx. 4,500 t; embankment reinforcements approx. 1,400 m²; amphibian tunnels approx. 280 m; amphibian guiding facilities approx. 1,800 m; corrugated steel culvert LW 3.18 23 m; hydroseeding approx. 52,000 m²; dry seeding approx. 120,000 m².
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0000NON-RESTRICTED-DOCUMENT
- TED HTML — 564882-2026HTML
- TED PDF — 564882-2026PDF
- TED XML — 564882-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.