Renovation of Giggelsberg inner-city and rural road
Road construction for the renovation of the Giggelsberg inner-city and rural road: approx. 570 m development length, including surface drainage, rainwater sewerage, street lighting, paving and natural stone works, adaptation of property driveways, and ancillary works. The road superstructure includes earthworks, frost protection and asphalt base layers, and an asphalt surface layer. In the rural section (construction km 0+000 to 0+264.757), the total build-up is 65 cm (4 cm asphalt surface layer AC 11, 10 cm asphalt base layer AC 32, 51 cm frost protection layer 0/56) with a road width of 4.50 m (5.50 m at passing bay). In the inner-city section (construction km 0+264.757 to 0+569.530), the total build-up is 60 cm (4 cm asphalt surface layer AC 11, 10 cm asphalt base layer AC 32, 46 cm frost protection layer 0/56) with a road width of 4.75 m. Side strips in the rural section consist of 10 cm concrete paving, 4 cm paving bed, 15 cm gravel base layer, and 31 cm frost protection layer. Also included are the construction and adaptation of side strips, driveways, connection areas, road drainage (street inlets, connection lines, manholes, rainwater channels), drainage facilities and pipe sections in the retention basin area (throttling, inflow/outflow, overflow, ditches, culverts), a natural stone wall at construction km 0+400, and adaptation works to existing structures.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Vergabeunterlagen (Portal)PORTAL
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.