Temporary pumping station for the Berlin Spandau lock
Planning and construction of a temporary pumping station at Spandau lock: includes calculations, static and hydraulic proofs, execution planning, assembly, and commissioning. The system is designed for an operating period of approximately 15 years, integrated as a fully reversible construction into the existing lock structure, and consists of a pump support cage, a shaft pump, a DN-800 pressure line, and an automatic screen cleaning system. The foundation is a pile foundation executed with a low-vibration method.
CONTRACTING AUTHORITY
CLASSIFICATION
Procedure Type
de-open
Contract Type
Works
Main CPV
45000000, Construction work.
Other CPV
43000000, Machinery for mining, quarrying, construction equipment.
44000000, Construction structures and materials; auxiliary products to construction (excepts electric apparatus).
71000000, Architectural, construction, engineering and inspection services.
ADDITIONAL DETAILS
Legal Basis
de-vob
DEADLINES & TIMELINE
Submission Deadline
52 days remaining(LOT-0000)
Published