Initial Cabling for the New Nuremberg Data Center
Notice title: Erstverkabelung des neuen RZ Nürnberg
System delivery and installation of a passive cabling infrastructure for the Nuremberg data center: complete delivery, assembly, labeling, acceptance support, and documentation of a passive cabling infrastructure, including extended planning and measurement according to existing cabling and occupancy plans. This includes project planning and technical detailed planning, timely delivery of all passive components (fiber optic and copper components, patch panels, ODF systems, trunk cables, patch cables, cable management, labeling, and accessories according to the bill of quantities), as well as the installation of a structured, modular, and scalable passive cabling in racks, distributors, cable trays, transfer points, and defined technical areas. Also included is the timely delivery of fiber optic and twisted pair patch cables according to the bill of quantities, including labeling as specified by the client. Execution of measurements, tests, and certification measurements according to agreed test criteria, creation of complete, electronically processable documentation (port, fiber, cable lists as specified by the client), online provision of measurement protocols for the fiber optic cabling to be installed, support for acceptance and defect rectification until operational handover. Ensuring redundant A/B connection paths, minimizing operational risks through standardized components and quality assurance, creating reserve capacities. The availability of the offered and installed components of the passive cabling infrastructure must be guaranteed for at least five years from acceptance of the service, including ODF systems, patch panels, chassis, cassettes, modules, trunk cables, patch cables, Keystone modules, cable management components, fastening materials, and other system-relevant accessories. Extensions, reorders, replacements, and exchange measures must be possible with identical or fully compatible components. If individual components are discontinued or technically developed further by the manufacturer within this period, equivalent and fully compatible successor components must be offered in a timely manner, and their compatibility with the existing overall system must be proven, without affecting the existing system warranty, documentation logic, labeling system, port and cassette assignment, or the operational and maintenance capability of the installed infrastructure. A manufacturer's or supplier's declaration regarding the availability, re-deliverability, or compatibility of the offered system components for at least five years must be submitted with the offer.
Missed this tender?
This deadline has passed. So it does not happen again: we send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 704100-2026HTML
- TED PDF — 704100-2026PDF
- TED XML — 704100-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.