Extension of Nutanix HCI Solution
Extension of the existing Nutanix HCI solution: Establishment of a second, independent cluster location in data center RZ1 (Zeppelinstraße 15) with synchronous mirroring (0-min-RPO) and a Witness server. This includes the delivery of four new, GPU-accelerated Nutanix NX-series nodes, the extension of Nutanix software licensing (NCI Ultimate, NCM Starter) for all existing and new nodes at both locations for a duration of 60 months, the delivery and installation of a Witness server at a third independent location, the delivery, installation, and configuration of data center switches in RZ1 including cabling, the physical relocation of three existing nodes from RZ2 to RZ1 with data migration during operation, the configuration of synchronous cluster coupling, project management, detailed concept, system tests, acceptance, and system documentation, as well as system service for 60 months from acceptance. Core switch pairs and the NetApp storage system are not part of this procurement.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0000NON-RESTRICTED-DOCUMENT
- TED HTML — 554037-2026HTML
- TED PDF — 554037-2026PDF
- TED XML — 554037-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.