Flare installation and slop system reconstruction for EUH2STARS
Notice title: EUH2STARS Fáklya telepítés és szlop rekonstrukció
Surface construction works for the EUH2STARS project of Magyar Földgáztároló Zrt. at Pusztaszőlős: installation of a new flare and reconstruction of the slop system. The project involves the injection of 2 x 100,000 Nm³ of hydrogen into the Komlós B-2 facility via the PSZ-36 gas well and the withdrawal of 100,000 Nm³ of natural gas-hydrogen mixture per cycle. Modifications to the PSZ-36 gas well structure, well area, and the DN80 PN160 well connection pipeline. Installation of surface technology for hydrogen injection and recovery, as well as experimental measurements at the Kardoskút Underground Gas Storage facility and Pusztaszőlős collection station. Construction of a DN80 PN160 dedicated pipeline for hydrogen transport between Kardoskút FGT and Pusztaszőlős collection station. Installation of a new flare system for burning off gases (hydrocarbons, inert gases, hydrogen) at 15,800 Nm³/h, with a maximum height of 22 m and a permitted heat radiation of 1,580 W/m² at the safety zone boundary. The system requires smokeless combustion, avoidance of continuous pilot flame, and provision of an ignition flame within 15 seconds in an emergency. Condensate from the new flare system will be routed to the existing slop system, with the existing slop collection tank being modified for automatic emptying into the formation water main pipeline. Construction of a 180 m long underground flare pipeline with a 0.5% continuous slope towards a concrete shaft with a vertical sump and pneumatic pump. Construction of a heating gas pipeline with a new DN32 branch from the 4 barg heating gas pipeline, approx. 50 m long, reducing to DN25. Construction of a slop pipeline: condensate from the DN200 flare pipeline flows into a vertical sump in a new underground concrete shaft, from where a pneumatic pump removes the liquid via a new DN25 pipeline to a new branch point on the existing slop main pipeline. A new pneumatic diaphragm pump and a new centrifugal pump will be installed for the automatic emptying of the slop tank into a DN50 formation water main pipeline. Above-ground slop pipelines will be equipped with electric trace heating and insulation. The flare site includes a local control panel, a HEI Control Rack, a flare stack pipe, and anchoring foundations, further items as per the tender documents.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 794987-2026HTML
- TED PDF — 794987-2026PDF
- TED XML — 794987-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.