Flare installation and slop system reconstruction for EUH2STARS

Notice title: EUH2STARS Fáklya telepítés és szlop rekonstrukció

Status
Active
Submission Deadline
34 days remaining
Location
Budapest, Hungary
Estimated Value
HUF 600,000,000
Procedure
Open Procedure · Works
Category
Construction work.Site preparation work.Services related to the oil and gas industry.
Published
Reference
ted-794987-2026

Surface construction works for the EUH2STARS project of Magyar Földgáztároló Zrt. at Pusztaszőlős: installation of a new flare and reconstruction of the slop system. The project involves the injection of 2 x 100,000 Nm³ of hydrogen into the Komlós B-2 facility via the PSZ-36 gas well and the withdrawal of 100,000 Nm³ of natural gas-hydrogen mixture per cycle. Modifications to the PSZ-36 gas well structure, well area, and the DN80 PN160 well connection pipeline. Installation of surface technology for hydrogen injection and recovery, as well as experimental measurements at the Kardoskút Underground Gas Storage facility and Pusztaszőlős collection station. Construction of a DN80 PN160 dedicated pipeline for hydrogen transport between Kardoskút FGT and Pusztaszőlős collection station. Installation of a new flare system for burning off gases (hydrocarbons, inert gases, hydrogen) at 15,800 Nm³/h, with a maximum height of 22 m and a permitted heat radiation of 1,580 W/m² at the safety zone boundary. The system requires smokeless combustion, avoidance of continuous pilot flame, and provision of an ignition flame within 15 seconds in an emergency. Condensate from the new flare system will be routed to the existing slop system, with the existing slop collection tank being modified for automatic emptying into the formation water main pipeline. Construction of a 180 m long underground flare pipeline with a 0.5% continuous slope towards a concrete shaft with a vertical sump and pneumatic pump. Construction of a heating gas pipeline with a new DN32 branch from the 4 barg heating gas pipeline, approx. 50 m long, reducing to DN25. Construction of a slop pipeline: condensate from the DN200 flare pipeline flows into a vertical sump in a new underground concrete shaft, from where a pneumatic pump removes the liquid via a new DN25 pipeline to a new branch point on the existing slop main pipeline. A new pneumatic diaphragm pump and a new centrifugal pump will be installed for the automatic emptying of the slop tank into a DN50 formation water main pipeline. Above-ground slop pipelines will be equipped with electric trace heating and insulation. The flare site includes a local control panel, a HEI Control Rack, a flare stack pipe, and anchoring foundations, further items as per the tender documents.

Free

Never miss a tender again

We send you 3 current matches that fit your company.

We call you once briefly to sharpen your search profile.

No account neededReply in 1-2 business days

By submitting, you agree that Patterno sends you matching tenders by email. Free, unsubscribe anytime. Privacy policy


Tender documents

  • Portal — LOT-0001NON-RESTRICTED-DOCUMENT
  • TED HTML — 794987-2026HTML
  • TED PDF — 794987-2026PDF
  • TED XML — 794987-2026XML
Free

Unlock documents for free

Enter your email address. If you confirm, we will also send you 3 similar tenders.

We call you once briefly to sharpen your search profile.

No account neededReply in 1-2 business days

By submitting, you agree that Patterno sends you matching tenders by email. Free, unsubscribe anytime. Privacy policy


Additional details

EU Funded
Yes
Suitable for SMEs
Yes
Electronic Submission
Required
Legal Basis
32014L0025

Similar tenders

Explore CPV 45

Current tenders in CPV division 45 are listed on the Akademie page for this category.

Live webinar

See Patterno work on a real tender

45 minutes live, questions answered in the chat. Upcoming dates on the signup page.

  • Matches from 4,500+ portals in one workspace
  • Qualify any tender against your criteria in minutes
  • Prepare bid documents from your company context

Prefer a 30-minute demo?