Telecommunications Technology for the Renovation of Albert-Einstein-School Sports Hall

Telecommunications technology for the renovation of the Albert-Einstein-School sports hall: Supply, mounting, programming, and commissioning of one voice alarm control unit; supply, mounting, and connection of 40 loudspeakers for the voice alarm system; supply, mounting, connection, and commissioning of one fire alarm system; supply, mounting, connection, and commissioning of one smoke and heat exhaust ventilation control unit; supply and laying of approx. 4,000 m of telecommunication cables and approx. 800 m of information and data network cables; supply, mounting, and connection of one 19" data distribution cabinet. Execution period: 12 working days after request, estimated start by 28.09.2026.

CONTRACTING AUTHORITY

Name

Kreisausschuss Main-Taunus-Kreis, Hochbau- und Liegenschaftsamt

City

Hofheim am Taunus

Country

DE

CLASSIFICATION

Procedure Type

Open Procedure

Contract Type

Works

Main CPV

45314000, Installation of telecommunications equipment.

Other CPV

45312100, Fire-alarm system installation work.

45312200, Burglar-alarm system installation work.

45314320, Installation of computer cabling.

ADDITIONAL DETAILS

EU Funded

Yes

Suitable for SMEs

Yes

Electronic Submission

Required

Legal Basis

32014L0024

DEADLINES & TIMELINE

Submission Deadline

28 days remaining

(LOT-0001)

Published

TENDER DOCUMENTS

28 days remaining

Similar Tenders

Explore CPV 45

Screed works for 2nd construction phase

Screed works for the 2nd construction phase: approx. 36 m³ stable bound screed (installation thickness 10 to 50 mm), approx. 25.5 m² leveling/thermal insulation 20 mm, approx. 250 m² leveling/thermal insulation 90 mm, approx. 12 m² leveling/thermal insulation 140 mm, approx. 215 m² impact sound insulation PE foam, d = 6 mm, approx. 980 m² impact sound insulation, d = 20 mm, approx. 65.5 m² impact sound insulation, d = 30 mm, approx. 1,260 m² (fast-setting) cement screed CT-C30-F6, 45-70 mm, approx. 11 m² sloped cement screed, high-strength and shrinkage-reduced.

Kreisausschuss Main-Taunus-Kreis, Hochbau- und Liegenschaftsamt

·Hofheim am Taunus
Deadline:July 27, 2026

Heating System Installation for Extension Building

Heating system installation for an extension building: Connection to the existing heating system of the main building via a new heating circuit including all necessary fittings, measurement, and safety devices. Execution as a closed hot water heating system according to DIN EN 12828, heating water compliant with VDI 2035. Hydraulic integration with a hydraulic separator and electronically controlled high-efficiency pumps with thermal insulation shells and communication interface. Fittings include shut-off valves, pressure-independent control valves, balancing valves, check valves, dirt traps, microbubble/magnetite separators, safety valves, thermometers, manometers, heat meters, filling, draining, and venting devices, all marked according to DIN 2403. Piping network as a two-pipe system made of seamless steel pipes (DIN EN 10216) with welded connections and sound-decoupled pipe clamps (DIN 4109), routing in technical rooms and above suspended ceilings, with thermal insulation according to the German Buildings Energy Act (GEG). Room heating via warm water underfloor heating as a low-temperature system in all common rooms, each with its own heating circuit. Heating circuit distributors are delivered pre-assembled, consisting of flow/return distributors, flow meters, pre-set valve inserts, shut-off, vent, draining devices, fastening systems, and distributor box. Preparation of heating circuit distributors for thermal/motor actuators, delivery and installation of distributors including valve inserts, creation of mechanical conditions for actuators. Hydraulic balancing of heating circuits. Heat metering via MID-compliant heat meter with M-Bus data transfer to building automation. Insulation of all heating pipes, fittings, and distributors according to GEG, with removable insulation caps on fittings. Marking of all components according to DIN 2403 and client specifications, including flow directions. Commissioning includes flushing, pressure testing, leak testing, filling with treated heating water, venting, hydraulic balancing, functional testing of heating circuits, trial operation of the entire system, and functional heating according to DIN EN 1264 during screed drying with documentation. Documentation before acceptance in paper and digital form: revision documents, as-built plans, hydraulic diagram, valve list, manufacturer proofs, maintenance/operating manuals, pressure test, flushing, water treatment, hydraulic balancing, functional heating, adjustment protocols, manufacturer documents, CE declarations of conformity.

Kreisausschuss Main-Taunus-Kreis, Hochbau- und Liegenschaftsamt

·Hofheim am Taunus
Deadline:August 12, 2026

Metal Construction Works for Doors, Structures, and Railings

Metal construction and locksmith works for the expansion of the Albert-Schweitzer-Schule in Hattersheim am Main. The construction project comprises the two-story new construction of a school extension building in hybrid construction (reinforced concrete skeleton construction with timber panel exterior walls). The services put out to tender include, in particular, the delivery and installation of sheet steel, stainless steel, and tubular frame fire doors, post-and-beam constructions for interior and exterior use, as well as locksmith works such as railings, handrails, and gratings. The metal construction and locksmith works trade dominates the tender.

Kreisausschuss Main-Taunus-Kreis, Hochbau- und Liegenschaftsamt

·Hofheim am Taunus
Deadline:September 07, 2026

Building Planning for Grundschule In den Sindlinger Wiesen

Building planning services according to §34 HOAI for the extension of Grundschule In den Sindlinger Wiesen: approximately 1,374 m² net floor area or 2,200 m² gross floor area for the extension building, constructed to passive house standard, barrier-free, including a rainwater cistern for toilet flushing, a photovoltaic system on the new and existing building, an elevator, a central ventilation system with displacement outlets and heat recovery without recirculation, electronic single-room control, and night cooling. The NSHV is to be extended, all classrooms will receive washbasins, and a Cook and Chill kitchen is to be planned. The project will be carried out during ongoing school operations, with minimized construction site area and restructuring of outdoor facilities. The preliminary estimated eligible costs are 6,340,168.58 EUR net. Service phases 2 (partially, 4% of basic services) and 3 (15% of basic services) are to be commissioned. An option for service phases 4-5 (Level II) and 6-9 (Level III) according to § 34 and Annex 10 No. 10.1 HOAI is included.

Kreisausschuss Main-Taunus-Kreis, Hochbau- und Liegenschaftsamt

·Hofheim am Taunus
Deadline:August 07, 2026

Find matching tenders automatically

With Patterno-HIT, receive relevant tenders daily, automatically filtered to your company profile.

Book Demo Now