Outdoor Facilities for New School Building
Outdoor facilities works for the construction of a new school: site setup and surveying (1 lump sum), earthworks (excavation, soil removal, backfilling) approx. 1,200 m³, topsoil works and terrain profiling approx. 700 m³, drainage pipes approx. 115 m, drainage channels approx. 60 m, concrete paving surfaces approx. 1,200 m², water-bound paths approx. 500 m², frost protection and base layers approx. 1,450 m², reinforcing steel approx. 800 kg, natural stone walls approx. 95 m², retaining walls (L-shaped blocks) approx. 155 m, stair systems and block steps approx. 65 m, kerbstones and edgings approx. 420 m, fence systems approx. 265 m, gate systems 2 units, electrical conduit systems approx. 650 m, outdoor lighting approx. 55 units, bicycle stands approx. 10 units, bench approx. 28 m, house connection box (1 lump sum), tool shed approx. 25 m², tree plantings approx. 55 units, plants approx. 2,100 units.
CONTRACTING AUTHORITY
Name
Lernen plus gGmbH Schloss Schönefeld
City
Leipzig
Country
DE
CLASSIFICATION
Procedure Type
Open Procedure
Contract Type
Works
Main CPV
45112700, Landscaping work.
ADDITIONAL DETAILS
EU Funded
Yes
Suitable for SMEs
Yes
Electronic Submission
allowed
Legal Basis
32014L0024
DEADLINES & TIMELINE
Submission Deadline
28 days remaining(LOT-0000)
Published