Skip to main content
Activehilma-EF-53568

Cast-in-place safety surfacing for Marielundinpuisto Park

Construction of cast-in-place safety surfacing for Marielundinpuisto Park in the Vuosaari district: The work includes the procurement, processing, and installation of all necessary materials, as well as labor and equipment costs. Safety surfacing materials must not contain harmful substances or PAH compounds exceeding guideline values; all materials require client approval. The client will perform excavation, backfilling, and sub-base preparation (30-50 mm below the bottom surface of the safety surfacing). The contract is a fixed-price lump sum, with execution from August 3 to September 4, 2026.

CONTRACTING AUTHORITY

Name

Stara (Helsingin kaupungin rakentamispalveluliikelaitos)

Country

FI

CLASSIFICATION

Procedure Type

Open Procedure

Contract Type

Works

Main CPV

45000000, Construction work.

ADDITIONAL DETAILS

Suitable for SMEs

Yes

Electronic Submission

Required

DEADLINES & TIMELINE

Submission Deadline

6 days remaining

(LOT-0000)

Published

TENDER DOCUMENTS

6 days remaining

Similar Tenders

Explore CPV 45
€20,000

Safety Surfaces for Maatullinpuisto Park

Construction of safety surfaces for Maatullinpuisto Park: Installation of safety surfaces and coconut fiber turf, including material procurement, processing, and installation, as well as labor and equipment. The contract covers the construction work for the safety surfaces according to work specification 2146.3 (synthetic safety surfaces). Materials must not contain harmful substances or PAH compounds exceeding guideline values. A successfully passed HIC field test report and CE markings/Declarations of Performance (DoP) for the materials must be submitted. All materials procured by the contractor require client approval. The client will perform the necessary excavation and backfill work and prepare the rough base for the installation surface (30-50 mm below the bottom surface of the safety surface). The work site is in the Suutarila district. Implementation period: August 3 to August 16, 2026. The procurement will be carried out as a fixed-price total contract with one contractor.

Stara (Helsingin kaupungin rakentamispalveluliikelaitos)

·FI1B1
Deadline:July 24, 2026

Renovation of swimming pool tiles for Uimastadion

Renovation of swimming pool tiles: The tiles of the swimming pools at Uimastadion, Hammarskjöldintie 5, 00250 Helsinki, are to be renovated. The preliminary work period is from 21.9.2026 to 11.4.2027.

Stara (Helsingin kaupungin rakentamispalveluliikelaitos)

·FI1B1
Deadline:August 10, 2026

Weather Protection for Swimming Stadium

Weather protection works for the Swimming Stadium: Works to be performed according to tender documents. Preliminary work period: 14.9.2026 - 25.4.2027. Preliminary total rental period: approx. 8 months. Location: Hammarskjöldintie 5, 00250 Helsinki.

Stara (Helsingin kaupungin rakentamispalveluliikelaitos)

·FI1B1
Deadline:August 03, 2026
€60,000

Playground and activity equipment for Vennynpuisto Park

Delivery of playground and activity equipment for Vennynpuisto Park: The equipment is to be delivered to the site, with a delivery date in September 2026; the exact time will be agreed separately.

Stara (Helsingin kaupungin rakentamispalveluliikelaitos)

·FI1B1
Deadline:July 22, 2026

Find matching tenders automatically

With Patterno-HIT, receive relevant tenders daily, automatically filtered to your company profile.

Book Demo Now