Electrical Installation for Paradestraße Subway Station (U6)
Renewal of the low-voltage system at Paradestraße subway station (U6): This includes tunnel lighting, working current sockets (ASS) in both directions (Platz der Luftbrücke and Tempelhof), and the renewal of all cables from the low-voltage distributions with associated cable routing on ceilings, walls, trays, and pipes. The conversion measures affect the UPS system (relocation from room 1 to room 308), the main distribution (Hvt, relocation from room 104 to room 1), the sub-distribution (Vt2-1 room 307), and the house connection distribution (HA/Vt1, relocation from room 201 to room 203). Also renewed are the tunnel lighting (incl. deep-level luminaires, tunnel center), working current sockets (ASS), platform lighting, cable systems in the station and tunnel, and the electrical installation of technical operating rooms and ancillary rooms. Two new exits (III/2 with stair 3 and II/4 with stair 1) will be constructed, including lighting for distribution halls II and I. The existing platform will be demolished, including UPS, service, staff, and storage rooms. After completion of the new platform, a new service room, WC rooms, and other ancillary rooms will be created. The HA/Vt1 and Vt2-1 will be renewed. New rooms with new electrical installations will be created in distribution hall II. The stairs of the new exits will receive wall and handrail luminaires. The existing stair 2 will be renewed. Distribution halls I and II will receive a new lighting system; further items as per the tender documents.
Berliner Verkehrsbetriebe, Bereich Einkauf/ Materialwirtschaft
·Berlin