General contractor services for the connection of the BGEA Neuweidenbach
Notice title: Generalunternehmerleistungen zum Anschluss der BGEA Neuweidenbach
Construction of a biogas injection plant (BGEA) including line-side development for the injection of processed biomethane into the long-distance gas pipeline FGL 046 (DN600): comprises three construction measures: branch valve group at FGL 046 with dismantling of existing components and new construction of a DN600 shut-off valve, outlets, blowers, and paved area; connection line FGL 46.16 of approx. 1,700 m DN100 in open trench construction, two field path crossings, cable protection pipe, and subsequent recultivation of agricultural land; BGEA site with connection line FGL 46.16.01, consisting of 300 m² paved plant area with access, fencing, lighting, foundations, and drainage, as well as approx. 45 m DN100 connection line to the biogas processing plant. The compact biogas injection plant (kBGEA) with internal equipment will be provided by the kBGEA constructor, with the performance boundary at the container's connection flanges. Planned construction start is July 2027, planned commissioning from June 2028.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0000NON-RESTRICTED-DOCUMENT
- TED HTML — 643673-2026HTML
- TED PDF — 643673-2026PDF
- TED XML — 643673-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.