Overall Contract for Converter E1 at Hamburg-Harburg Converter Station

Planning, manufacturing, and commissioning of a new railway power converter E1, along with the revision and partial renewal of the 35MW converter E2 (manufacturer ELIN, built 1996) for the Hamburg-Harburg converter station. This includes the new development and manufacturing of all auxiliary units, switchgear, and the entire periphery required for the recommissioning of the plant, considering interfaces with the retrofit of machine E2.

CONTRACTING AUTHORITY

Name

DB Energie GmbH (Bukr 31)

City

Frankfurt Main

Country

DE

Website

CLASSIFICATION

Procedure Type

neg-w-call

Contract Type

Supplies

Main CPV

31121111, Electric rotary converters.

ADDITIONAL DETAILS

EU Funded

Yes

Suitable for SMEs

No

Electronic Submission

Required

Legal Basis

32014L0025

17 days remaining

Similar Tenders

Explore CPV 31

Construction of Crossings and Cable Shafts for Kornweide Rectifier Plant

Construction of crossings and installation of cable shafts: two crossings at kilometer 8.973 and kilometer 9.006, including cable shafts, as part of the new construction of the Kornweide Rectifier Plant.

DB Energie GmbH (Bukr 31)

·Frankfurt Main
Deadline:September 03, 2026

Simulation and Expert Services for Railway Energy Supply Network Design

Simulation and expert services for the system design of railway energy supply networks: EMT analyses, high-voltage simulations, system-technical consulting, modeling, simulation, measurement data evaluation, protection and control technology, and consulting on supply solutions within DB Energie's nationwide network.

DB Energie GmbH (Bukr 31)

·Frankfurt Main
Deadline:September 30, 2026

Installation of a low-voltage house connection and dismantling of a medium-voltage transformer station for Eisenhüttenstadt station

Installation of a low-voltage house connection and dismantling of a medium-voltage transformer station at Eisenhüttenstadt station: Decommissioning of the existing, technically outdated transformer station TÜ 4127, replacement with a new low-voltage house connection from the local grid operator. Construction of a new meter connection column and a new low-voltage main distribution board outdoors. Extensive continued use, switching over, and reconnecting existing consumer connections and cables to the new system. Installation of a new earthing system with railway earthing. After commissioning the new supply, complete dismantling and professional disposal of the old transformer station including building, switchgear, and other system components. Maintenance of the railway infrastructure's power supply throughout the entire construction phase to avoid restrictions on railway operations.

DB Energie GmbH (Bukr 31)

·Frankfurt Main
Deadline:August 21, 2026

Pre-announcement Specification Converter Technology for Railway Power Grid

Publication of a draft specification for converter technology for the railway power grid of DB Energie GmbH: The aim is to provide expert market participants with an early opportunity to review the planned technical requirements and provide feedback before an official tender. The railway power grid (110 kV and 15 kV; 16.7 Hz) is supplied by converter plants as grid coupling. Experience as a manufacturer, system provider, or integrator in power electronic converter technology is required, particularly knowledge in project planning, manufacturing, delivery, integration, commissioning, and/or operation of converter technology for railway power applications or comparable high-performance energy conversion systems. Expertise is required in converter technology for 16.7 Hz railway power generation (110kV or 15kV) or comparable frequency converter/grid coupling systems, power electronics, interfaces to transformers, protection technology, station control technology, medium-voltage switchgear and auxiliary power systems, grid connection, grid interactions, control technology and system integration, as well as technical and economic evaluation of converter system requirements.

DB Energie GmbH (Bukr 31)

·Frankfurt Main
Deadline:September 30, 2026