H2G Battery and CHP System
Planning, construction, delivery, and commissioning of a battery-electric energy storage system and the integration of a provided hydrogen CHP unit: Establishment of a defect-free, operational, and safely functioning overall system at the KST site for a real laboratory for hydrogen production and use within the "H2-Grid" project, including all necessary auxiliary facilities, interfaces, documentation, and proofs. Services must be completed by 30.06.2027 and invoiced by 31.05.2027.
CONTRACTING AUTHORITY
Name
Hochschule Reutlingen
City
Reutlingen
Country
DE
CLASSIFICATION
Procedure Type
neg-w-call
Contract Type
Supplies
Main CPV
31430000, Electric accumulators.
Other CPV
38800000, Industrial process control equipment and remote-control equipment.
38400000, Instruments for checking physical characteristics.
ADDITIONAL DETAILS
EU Funded
Yes
Suitable for SMEs
Yes
Electronic Submission
Required
Legal Basis
32014L0024
DEADLINES & TIMELINE
Submission Deadline
31 days remaining(LOT-0001)
Published