Heating, Ventilation, Sanitary Works for Heating Center School Campus Zell-Weierbach
Heating, ventilation, and sanitary works: 1 unit slop sink, approx. 25 m pressed stainless steel drinking water pipe DN15-20, approx. 40 m PP push-fit wastewater pipe DN 50-100, approx. 20 m PE wastewater pressure pipe DN40-50 with connection to a pre-installed lifting unit; installation of a heat pump with CO2 refrigerant, power approx. 330 kW, approx. 35 m buried, pre-insulated PE pipe NW110 for heating systems in a pre-installed trench, approx. 50 m welded steel pipe DN100, approx. 65 m pressed carbon steel DN 15-80, 4,000 l buffer tank, installation of flanged fittings, refill system with integrated vacuum degassing, 2.2 kW network pump, filling of the pre-installed heating network approx. 2,000 l; ventilation unit as a compact system for ceiling mounting 300 m³/h, 2x fire dampers, supply of 2 rooms with supply and exhaust air including volume flow controllers and silencers.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0000NON-RESTRICTED-DOCUMENT
- TED HTML — 610570-2026HTML
- TED PDF — 610570-2026PDF
- TED XML — 610570-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.