Skip to main content
Activeted-475826-2026

Water Cycle Installations: Supply, Design, Construction, and Operation

Water Cycle Installations: Supply, design, construction, and operation of systems in France (Metropolitan, Corsica, Overseas), Europe, Africa, and the Middle East.

CONTRACTING AUTHORITY

Name

SID EPN

City

VERSAILLES

Country

FR

CLASSIFICATION

Procedure Type

Restricted Procedure

Contract Type

Services

Main CPV

65120000, Operation of a water-purification plant.

LOTS (2)

LOT-0001Services

Installationen für den Wasserkreislauf in Frankreich

€4,000,000

LOT-0002Services

Installationen für den Wasserkreislauf in Europa, Afrika und dem Nahen Osten

€12,000,000

ADDITIONAL DETAILS

EU Funded

Yes

Suitable for SMEs

Yes

Electronic Submission

Required

Legal Basis

32014L0024

DEADLINES & TIMELINE

Submission Deadline

77 days remaining

(LOT-0001)

Published

TENDER DOCUMENTS

77 days remaining

Similar Tenders

Explore CPV 65
SEK 191M

Electricity Procurement for the Municipalities of Lidköping, Skara, Götene, Grästorp, and Essunga

Electricity procurement for the municipalities of Lidköping, Skara, Götene, Grästorp, and Essunga, including their associated companies and organizations: physical electricity delivery, step-based price hedging, and associated administration, reporting, and follow-up. The scope includes approximately 52.8 GWh per year and approximately 1,307 electricity subscriptions.

Skara Kommun

·Skara
Deadline:August 28, 2026
€2.6M

Electrical Engineering for the Renewal of the Water Softening Plant of Stadtwerke Reinheim

Electrical, measurement, control, and regulation technology (EMSR) and emergency power system (NEA) for the renewal of a water softening plant.

Stadtwerke Reinheim

·Reinheim
Deadline:August 17, 2026
€91M

Global Performance Contract for Construction of Methanisation Unit and Operation of Colmar Wastewater Treatment Plant

Global performance contract: Design and construction of a sludge methanisation unit, including all associated structures and equipment (thickening, upstream and downstream storage, methanisation, biogas treatment, dehydration, return treatment, deodorisation, roads and utilities, technical building), and improvement works at the station inlet. Additionally, the contract covers the operation, maintenance, patrimonial management, management of sludge, by-products, waste, and discharges, surveillance, regulatory self-monitoring, information system and data management, and assistance to SITEUCE for all current and future installations of the Colmar wastewater treatment plant, with performance commitments. The operation component will come into effect on January 1, 2028, for all existing works concerned and will continue after the commissioning and observation period of the methanisation unit.

SITEUCE

·Colmar
Deadline:August 10, 2026

Engineering, Supply, Construction, and Operation of a Battery Energy Storage System for Perquie

Battery Energy Storage System (BESS) for Perquie: Engineering, supply of all equipment (excluding DC block), construction, and operation & maintenance (O&M). Usable battery capacity is approximately 130 MWh at the beginning of life, battery power approximately 65 MW at POC 63 KV, technology LFP (lithium-iron-phosphate). Estimated COD is August 2028. The engineering scope includes the production of detailed execution plans for all components of the plant. The construction scope comprises total or partial site preparation, supply and installation of AC block equipment (PCS, skid, control system), installation of DC equipment provided by the client (integrated into calculations), supply chain management, on-site installation, and connection. The O&M scope has an estimated duration of 20 years and includes operation, 24/7 supervision with remote alarm acknowledgment and site security, preventive maintenance of AC and DC equipment, reporting of unavailability to the aggregator, corrective maintenance of AC and DC equipment, warranty management and regulatory controls, relationship with EDF Power Solutions and the grid operator, and maintenance of battery performance (availability, SOH, RTE, auxiliary consumption). EDF Power Solutions reserves the option to withdraw services related to DC and/or AC equipment during the realization and/or O&M phase at the time of consultation.

EDF power solutions

·Nanterre
Deadline:July 30, 2026

Find matching tenders automatically

With Patterno-HIT, receive relevant tenders daily, automatically filtered to your company profile.

Book Demo Now