Cooling Technology for the Expansion of ARZ Mainz Data Center

Cooling technology systems for the expansion of the ARZ Mainz data center (Walter-Hallstein-Straße 20): Increase of cooling capacity from 1,120 kW to 2,220 kW to reach the final expansion stage of the TIER-3 data center; further items as per the tender documents.

CONTRACTING AUTHORITY

Name

Mainzer Stadtwerke AG

City

Mainz

Country

DE

CLASSIFICATION

Procedure Type

Open Procedure

Contract Type

Works

Main CPV

45331000, Heating, ventilation and air-conditioning installation work.

ADDITIONAL DETAILS

EU Funded

Yes

Suitable for SMEs

No

Electronic Submission

allowed

Legal Basis

32014L0024

DEADLINES & TIMELINE

Submission Deadline

28 days remaining

(LOT-0000)

Published

TENDER DOCUMENTS

28 days remaining

Similar Tenders

Explore CPV 45

Electrical Engineering for Data Center Expansion in Mainz

Electrical installations for the expansion of the high-availability ARZ Mainz data center: power increase of the UPS system from 880 kW to 1,750 kW and the cooling system from 1,120 kW to 2,220 kW to reach the final expansion stage of the TIER-3 data center; further items as per the tender documents.

Mainzer Stadtwerke AG

·Mainz
Deadline:August 21, 2026

Electrification Works for Municipalities of SIE Sud-de-la Reole

Electrification works: estimated annual contract value net between 100,000 EUR and 1,000,000 EUR.

SIE SUD-DE-LA REOLE

·Aillas
Deadline:September 04, 2026
€16.6M

Reconstruction of Kolodrum Sports Facility into Multifunctional Sports Hall, Phase 1, Kazanlak

Construction of a multifunctional sports hall: Gross floor area 11,258 sq.m., built-up area 7,075 sq.m. The first phase includes the reconstruction of the "Kolodrum" sports facility into an indoor multifunctional sports hall, providing the playing field with sports flooring and equipment for basketball, volleyball, and handball. The playing field will feature durable polyurethane flooring on a concrete base. Also planned are Building Water Connection 1, Building Water Connection 2, and a Building Sewage Connection. The hall's capacity for events in the sports area is 1,000 standing places or up to 700 on movable stands. Modular, movable, telescopic stands for up to 700 seats near the playing field are planned. The main spectator stands offer 1,150 seats.

ОБЩИНА КАЗАНЛЪК

·гр.Казанлък
Deadline:August 31, 2026

Disposal of asbestos-containing construction waste

Disposal of asbestos-containing construction waste: includes all activities for handling, loading, packaging, transport, and handover to an authorized disposal entity. The waste is located on plots p. č. 346/38, p. č. 846, p. č. 847, p. č. 848, p. č. 849, p. č. 346/15 in the cadastral area and municipality of Sokolov. On-site, only loading, packaging, and removal of the waste are permitted.