Sewer Construction for Bus Depot North Conversion, 2nd Construction Phase

Status
Active
Submission Deadline
17 days remaining
Contracting authority
Location
Köln, Germany
Procedure
Open Procedure · Works
Category
Canal construction.Works for complete or part construction and civil engineering work.
Published
Reference
ted-514317-2026

Earthworks for the conversion of Bus Depot North, 2nd construction phase: Creation of trench lines (shored and unshored, up to 5.00 m deep) and excavation pits (up to approx. 5.50 m below ground level, including for the rainwater treatment plant), including loosening, loading, and temporary storage of excavated material. Soil sampling according to EBV and subgrade and bearing capacity verifications are required. Backfilling is done in layers with suitable sand/gravel-sand 0/8 mm in the pipe zone and with permissible re-usable material or delivered replacement material in the main backfill; a temporary sub-base layer is to be installed. Shoring works include trench shoring and soldier pile shoring for deeper areas. Drainage sewer works involve the complete renewal and adaptation of the rainwater drainage system (including rainwater treatment plant) and the foul water sewer, including pipe laying, fittings, manholes, and connections. Connection lines to the planned road gullies are to be constructed up to the temporary sub-base layer or to the later connection point of the new road gullies. Pipe ends are to be measured, documented, and provisionally sealed. Temporary surface drainage must be ensured throughout the construction period; existing road gullies are to be kept in operation until the new drainage facilities are constructed, or provisionally connected/replaced if necessary (e.g., by provisional pipe connections, temporary channels, hose lines, or pumping measures). Pipe securing, control, and testing include optical inspections (camera inspection, moling of empty conduits), leak tests, and metrological surveying of the installed systems in open trenches. Demolition and dismantling works include surface demolitions (coverings, fastenings) and the removal of existing pipes and structures. Documentation includes photo documentation, hand-revised as-built plans, and complete trade-specific object documentation. Execution takes place under ongoing bus and workshop operations, in sections, in accordance with VOB and DIN standards (DIN 18300, DIN 4124, DIN EN 1610, DWA-A 139).

Free

Never miss a tender again

We send you 3 current matches that fit your company.

With a number we call briefly to sharpen your search profile.

No account neededReply in 1-2 business days

By submitting, you agree that Patterno sends you matching tenders by email and, if you leave a number, calls you once about it. Revocable at any time. Privacy policy


Tender documents

  • Portal — LOT-0000NON-RESTRICTED-DOCUMENT
  • TED HTML — 514317-2026HTML
  • TED PDF — 514317-2026PDF
  • TED XML — 514317-2026XML
Free

Unlock documents for free

Enter your email address. If you confirm, we will also send you 3 similar tenders.

No account neededReply in 1-2 business days

By submitting, you agree that Patterno sends you matching tenders by email. Free, unsubscribe anytime. Privacy policy


Additional details

Suitable for SMEs
No
Electronic Submission
Required
Legal Basis
32014L0025
Live webinar

See Patterno work on a real tender

45 minutes live, questions answered in the chat. Upcoming dates on the signup page.

  • Matches from 4,500+ portals in one workspace
  • Qualify any tender against your criteria in minutes
  • Prepare bid documents from your company context

Prefer a private session?