Water-side ground investigation for Köhlbrandquerung
Notice title: Köhlbrandquerung - Baugrunderkundung wasserseitig Los 3
Water-side ground investigation: 33 dry boreholes with continuous soil sample extraction and 36 cone penetration tests (CPT) as part of the main ground investigation. Of these, 3 dry boreholes and 2 CPTs are for the Pylon West land reclamation area, and 7 dry boreholes and 7 CPTs are for the demolition of the old Köhlbrand Bridge in Rugenberger Hafen and Travehafen. The planned drilling depths for dry boreholes are expected to be between 30 m and 70 m; CPTs will be performed until equipment capacity is reached.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 729755-2026HTML
- TED PDF — 729755-2026PDF
- TED XML — 729755-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.