Skip to main content
Activeted-527058-2026

Laboratory Services for JSW S.A. Plants

Laboratory services: Performing tests and measurements for JSW S.A. plants. The detailed scope of services is described in the technical specification, which is attachment No. 1 to the SWZ.

CONTRACTING AUTHORITY

Name

Jastrzębska Spółka Węglowa S.A. z siedzibą w Jastrzębiu Zdroju, Zakład Wsparcia Produkcji

City

Jastrzębie-Zdrój

Country

PL

CLASSIFICATION

Procedure Type

Open Procedure

Contract Type

Services

Main CPV

71900000, Laboratory services.

LOTS (3)

LOT-0001Services

Laboruntersuchungen von Gasen, Grubenstaub und Sachverständigenleistungen für JSW S.A. Werke

LOT-0002Services

Laboruntersuchungen von Gasen, Grubenstaub, Feinfraktionsabfällen und Sachverständigenleistungen für JSW S.A. Werke

LOT-0003Services

Messungen von schädlichen und belastenden Faktoren im Arbeitsumfeld für JSW S.A. Werke

ADDITIONAL DETAILS

Electronic Submission

Required

Legal Basis

32014L0025

15 days remaining

Similar Tenders

Explore CPV 71

Maintenance and repair of main ventilation fans and associated components for Borynia-Zofiówka mine

Periodic inspection of main ventilation fans type WPK 3.9 W-1, W-2, and W-3, and repair of shut-off valves, reversing flaps, and sluice doors at shaft Vz of the Borynia-Zofiówka mine, Zofiówka section.

Jastrzębska Spółka Węglowa S.A. z siedzibą w Jastrzębiu Zdroju, Zakład Wsparcia Produkcji

·Jastrzębie-Zdrój
Deadline:September 01, 2026

Maintenance and Service for ECOMAX 20 and ECOMAX 40 CHP Systems at KWK „Budryk“

Maintenance and service for ECOMAX 20 and ECOMAX 40 CHP systems: periodic inspections and service operations for the systems at KWK „Budryk“.

Jastrzębska Spółka Węglowa S.A. z siedzibą w Jastrzębiu Zdroju, Zakład Wsparcia Produkcji

·Jastrzębie-Zdrój
Deadline:August 07, 2026

Shaft deepening and two-sided shaft inlet for Shaft II of KWK „Borynia-Zofiówka“ at 1120 m level

Shaft deepening for Shaft II of KWK „Borynia-Zofiówka“ Ruch „Borynia“ and construction of a two-sided shaft inlet at the 1,120 m level. Further details are as per the tender documents.

Jastrzębska Spółka Węglowa S.A. z siedzibą w Jastrzębiu Zdroju, Zakład Wsparcia Produkcji

·Jastrzębie-Zdrój
Deadline:August 18, 2026

Operation of Systems for Filling Mining Excavations with Power Plant Waste at KWK „Pniówek“

Complex services for the operation of surface and underground equipment and installations for the production and transmission of a mixture of power plant waste (by-product) and mine water, possibly with the addition of anti-pyrogenic agents, for filling goafs, mining excavations, and explosion-proof dams at KWK „Pniówek“.

Jastrzębska Spółka Węglowa S.A. z siedzibą w Jastrzębiu Zdroju, Zakład Wsparcia Produkcji

·Jastrzębie-Zdrój
Deadline:August 14, 2026

Find matching tenders automatically

With Patterno-HIT, receive relevant tenders daily, automatically filtered to your company profile.

Book Demo Now