Landscaping works for Primary School 43
Landscaping works for the new construction of Primary School 43 in Erfurt-Vieselbach: 1 unit crown care for large tree (height up to 15m, width up to 10m) including tree protection (board casing) and watering during construction; 5 units secure and adjust shafts to height; 20 m protection of existing lines including securing of 5 units cable crossings and 3 units valves; 10 m³ earthworks and exploratory excavations by hand, partly under trees; 4 m³ demolish and dispose of foundations, of which 2 m³ by hand; 100 m³ loosen and dispose of soil; 100 m³ loosen and re-install soil; 180 m² prepare vegetation area, of which 50 m² by hand under trees; 160 linear meters steel band path edging; 60 m² concrete rectangular paving; 550 m² create asphalt surfaces in irregular partial areas, including surface treatment with reaction resin broadcast; 40 m² edging for play areas made of natural stone small paving, curved shape, width 0.8-1.2m; 160 m² fall protection surfaces, of which 40 m² wood chips and 120 m² fall protection sand; 85 linear meters ground markings (lines, circles, numbers); 10 m³ concrete foundations; 16 units bicycle stands; 9 units ram protection bars for waste bins; 2 units waste containers; 4 units bench-table combinations (steel basic construction, HPL coverings); 1 unit sun sail (side length 8m, triangular); 2 units seating platforms (steel basic construction, HPL coverings; triangular footprint, side lengths 2 to 14m); 1 climbing facility; 1 unit balancing facility; 1 unit round table tennis table; 12 linear meters wooden play wall (height up to 3m), install from client's stock, including substructure; 8m concrete block step; 50 m steel fence (frames and infill bars, height 1.7m, in sections of approx. 3m), partly to be fitted into existing plinth wall; 1 unit gate (two-leaf, width 1.5m); 2 units gates (width 1.1m) deliver and install; 28 units core drillings in existing plinth wall (depth 80 cm); 2 units decorative steel gates, from client's stock, refurbish and install (height 2m, width 4.6m, leaf); 65 m³ excavation for trenches for pipes and lines (depth up to 1m); 15 m³ create inspection pits, exploratory excavation; 30 linear meters stormwater drain in sections; 4 units yard drains B125 and C250; 120m drainage channels (nominal width 100, C250); 13 m facade channel A15 (width 185mm), installation in partial sections; 3 units clean-off grates 2.5*1.2 m; 85 linear meters cable protection pipes (PE DN 100); 6 m³ excavation pit for lighting mast; 5 units mast sleeves for lighting masts; 5 units standard trees (stem circumference 12-14 cm to 18-20 cm) deliver, plant, including completion and 2-year development care; 60 m³ tree substrate deliver and install; 185 m² create lawn; 50m leak test for sewer; workshop and assembly documents for fences and gates; detailed design for seating platforms; 2 units sampling and analysis of soil/excavated material according to EBV and LAGA; 4 units dynamic and 4 units static load plate; 1 unit digital new inventory survey; safety-technical initial inspection of entire outdoor area; winter construction site; planting works as a later partial service.
CONTRACTING AUTHORITY
Name
Landeshauptstadt Erfurt, Stadtverwaltung, Stadtkämmerei-Verdingungsstelle
City
Erfurt
Country
DE
CLASSIFICATION
Procedure Type
Open Procedure
Contract Type
Works
Main CPV
45112710, Landscaping work for green areas.
ADDITIONAL DETAILS
EU Funded
Yes
Suitable for SMEs
Yes
Electronic Submission
Required
Legal Basis
32014L0024
DEADLINES & TIMELINE
Submission Deadline
29 days remaining(LOT-0000)
Published