Shoring and Special Civil Engineering Works for Primary School 19
Shoring and special civil engineering works for the expansion of Primary School 19 and the new construction of a canteen for the "Christian Reichart School" in Erfurt, following the demolition of the old after-school care building: excavation of building pit up to approx. 4.00 m below ground level, approx. 3,200 m³; disposal of excavated soil BM-F0, DK I, approx. 6,800 t; preparation of building pit subgrade with gravel base layer approx. 20 cm thick, approx. 1,800 m²; backfilling of building pits approx. 400 m³; pipe trenches/sewer lines DN 110-160, approx. 100 m; soldier pile wall, not anchored, HEB260-320, drilling lengths up to approx. 8.00 m, approx. 180 m².
CONTRACTING AUTHORITY
Name
Landeshauptstadt Erfurt, Stadtverwaltung, Stadtkämmerei-Verdingungsstelle
City
Erfurt
Country
DE
CLASSIFICATION
Procedure Type
Open Procedure
Contract Type
Works
Main CPV
45221250, Underground work other than tunnels, shafts and subways.
Other CPV
45262212, Trench sheeting work.
ADDITIONAL DETAILS
EU Funded
Yes
Suitable for SMEs
Yes
Electronic Submission
Required
Legal Basis
32014L0024
DEADLINES & TIMELINE
Submission Deadline
28 days remaining(LOT-0000)
Published