Ventilation Systems for a Tower Building at a Military Airfield
Ventilation installation and dismantling works in a tower building of a military airfield: 1 full air conditioning unit approx. 2,000 m³/h, 1 recirculation heating/cooling unit approx. 6,500 m³/h, 2 smoke extraction axial fans 800 or 20,000 m³/h, approx. 600 m² ventilation ducts made of galvanized steel sheet, approx. 80 m² fire-resistant smoke extraction ducts, approx. 700 linear meters galvanized spiral-seam ducting nominal diameter 100 - 315, approx. 40 fire dampers of round/rectangular design, approx. 90 pieces for installation in air ducts, approx. 100 ventilation outlets / grilles, approx. 900 m² dismantling of ventilation ducts made of galvanized steel sheet, and dismantling of several HVAC systems with a total volume of 20,000 m³/h.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0000NON-RESTRICTED-DOCUMENT
- TED HTML — 575378-2026HTML
- TED PDF — 575378-2026PDF
- TED XML — 575378-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.