Mechanical, Electrical, and Control Technology for Eiweiler Water Treatment Plant
The Nonnweiler Dam Association is building a water treatment plant with a capacity of 800m³/h. This lot covers all technical equipment, including machinery and control systems.
CONTRACTING AUTHORITY
Name
Talsperrenverband Nonnweiler
City
Nonnweiler
Country
DE
CLASSIFICATION
Procedure Type
neg-w-call
Contract Type
Works
Main CPV
45252126, Drinking-water treatment plant construction work.
Other CPV
45311200, Electrical fitting work.
45315100, Electrical engineering installation works.
45315500, Medium-voltage installation work.
45315600, Low-voltage installation work.
45315700, Switching station installation work.
45317100, Electrical installation work of pumping equipment.
45317300, Electrical installation work of electrical distribution apparatus.
45351000, Mechanical engineering installation works.
ADDITIONAL DETAILS
Suitable for SMEs
No
Electronic Submission
Required
Legal Basis
32014L0025
DEADLINES & TIMELINE
Submission Deadline
27 days remaining(LOT-0001)
Published