Metal construction works: Installation of a sectional door system for the Fire Technology Center Burg
Installation of a sectional door system: site setup, mobile elevating work platform, 1 aluminum frame door leaf, 1 integrated wicket door without trip hazard, 1 wicket door switch, 1 anti-panic function, 1 raised fitting, 2 spring break safety devices, 3.5 linear meters of track connection, 4 galvanized support materials, 1 hand chain hoist, 1 frequency converter drive and control, 1 release mechanism, 1 RED-GREEN traffic light; additionally 5 hours of skilled worker labor and 5 hours of helper labor. Performance period approx. 1.5 months.
CONTRACTING AUTHORITY
CLASSIFICATION
Procedure Type
de-open
Contract Type
Works
Main CPV
45000000, Construction work.
Other CPV
43000000, Machinery for mining, quarrying, construction equipment.
44000000, Construction structures and materials; auxiliary products to construction (excepts electric apparatus).
71000000, Architectural, construction, engineering and inspection services.
ADDITIONAL DETAILS
Legal Basis
de-vob
DEADLINES & TIMELINE
Submission Deadline
30 days remaining(LOT-0000)
Published