Modernization of Road Infrastructure DJ 205L: Design, Technical Assistance, and Construction
Design services and construction works for the modernization of road infrastructure DJ 205L on sections int. DJ 205D (Grumaz) - Vrâncioaia, Spinești – Păulești - Tulnici - int. DN2D: Preparation of technical documentation (DTAC, DTOE, DTAD if applicable, PTE, as-built), documentation for permits and approvals, water management authorization documentation if applicable, and technical assistance from the designer during execution. The works execution duration is 30 months, design services duration is 3 months. Technical assistance is provided for the entire works execution period. The contract is concluded under the resolutory condition that if funding is not obtained within a maximum of 12 months from contract signing, the contract will be terminated.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0000NON-RESTRICTED-DOCUMENT
- TED HTML — 514753-2026HTML
- TED PDF — 514753-2026PDF
- TED XML — 514753-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.