Modernization of Chiller Cooling System BST
Modernization of the cooling system for a chiller in the left cooling circuit in BST by replacing a fan cooler (drycooler): includes preparation of the device foundation project, dismantling of the existing installation, preparation of as-built documentation, 5 years of warranty inspections, and staff training. The delivery must comprise a factory-new, complete, technically sound, and RoHS-compliant device, not slated for production discontinuation, sourced from a distribution channel serving the Polish market. Electrical installation according to the project, along with the provision of operating instructions and necessary software/licenses, is also part of the contract. A mandatory site visit is required. An option for the purchase of further items exists.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 480557-2026HTML
- TED PDF — 480557-2026PDF
- TED XML — 480557-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.