MSR Installations for New Zoo Restaurant Building
MSR installations for the new construction of a zoo restaurant with basement, ground floor, and first floor: 21 electric damper actuators (24 V nominal voltage), 18 differential pressure monitors, 4 frost protection monitors, 2 outdoor temperature transducers, 17 air duct transducers, 9 smoke detectors for air ducts, 5 heating mixers (DN15-DN25), one DDC substation with input and output communication (approx. 668 units according to function list column 7.1), block data communication (approx. 227 units according to function list column 7.2), event long-term storage (approx. 193 units according to function list column 7.3), historization (approx. 35 units according to function list column 7.4), one 1:1 test of all data points, one control cabinet (W/H/D approx. 2400/2100/500), one manual control level (switching/setting/display), one overvoltage protection, one UPS system, one communication module, halogen-free installation cable 3x1.5 (approx. 380 m), halogen-free installation cable 3x2.5 (approx. 100 m), halogen-free installation cable 4x2.5 (approx. 125 m), halogen-free installation cable 5x2.5 (approx. 140 m), halogen-free installation cable 2x2x0.8 (approx. 2,620 m), halogen-free installation cable 4x2x0.8 (approx. 1,160 m).
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0000NON-RESTRICTED-DOCUMENT
- TED HTML — 607042-2026HTML
- TED PDF — 607042-2026PDF
- TED XML — 607042-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.