Temporary Bypass and Demolition of Existing Structure for A565/A61 Construction work for a temporary bypass and the demolition of an existing structure: approx. 3,910 m² excavation shoring (sheet piling), approx. 575 m³ excavation, approx. 9,500 m³ earth material for ramps (delivery and installation), including material for backfilling, approx. 80.5 m temporary bridge (provided by the client), approx. 318 t steel transport for temporary bridge SS80 (bridge components), approx. 155 t steel transport for temporary bridge SS80 (launching nose), approx. 26 t steel transport for temporary bridge SS80 (roller batteries), approx. 150 m³ in-situ reinforced concrete, approx. 215 m² formwork, approx. 25 t reinforcing steel, approx. 1,250 m³ demolition and dismantling of concrete, approx. 6,200 m³ earthworks including road surface breaking, approx. 150 m installation of DN 300 pipelines, approx. 850 m³ frost protection layer 0/32, approx. 1,640 m² asphalt base course made of AC 22 T S, approx. 1,600 m² asphalt binder course made of SMA 16 B S, approx. 1,600 m² asphalt wearing course made of SMA 8 S, approx. 1,240 m dismantling of safety barriers, approx. 1,122 m installation of safety barriers, approx. 6 units dismantling of transition constructions, approx. 13 units installation of transition constructions, approx. 2 units dismantling of crash attenuators, and approx. 2 units installation of crash attenuators.
Die Autobahn GmbH des Bundes - NL Rheinland
· Krefeld