Skip to main content
Activeted-494246-2026

New Construction of Karla Halíře Art Primary School in Vrchlabí

New construction of Karla Halíře Art Primary School in Vrchlabí: Erection of a two-story, non-basement building with a partial attic conversion, including foundations, load-bearing structure, building envelope, roof structure, complete interior constructions, surface treatments, and all finishing works. The building will contain classrooms, a concert and dance hall, an art studio with a ceramic kiln, administrative facilities, sanitary facilities, storage, technical rooms, and building services. This includes the realization of all technical building equipment and infrastructure, specifically new connections for low-voltage electricity, water, sewage and rainwater drainage, communication lines, and the main pipeline for geothermal wells. Installation of a complete heating and cooling system using a ground-source heat pump with geothermal wells, ventilation technology, sanitary installations, electrical installations, measurement and control systems, and hot water preparation. Also included are all outdoor facilities and works, such as paved and unpaved areas, landscaping, technical infrastructure, and the construction of a shelter for municipal waste and bicycle stands. Excluded are loose furniture and equipment not technically connected to the building (tables, chairs, electronics). The service comprises all deliveries, installations, tests, revisions, functional tests, commissioning, handover of relevant documents, certificates, warranties, training of operating personnel, as-built documentation, and securing the legally binding occupancy permit; further items as per the tender documents.

CONTRACTING AUTHORITY

Name

Město Vrchlabí

City

Vrchlabí

Country

CZ

CLASSIFICATION

Procedure Type

Open Procedure

Contract Type

Works

Main CPV

45000000, Construction work.

Other CPV

45200000, Works for complete or part construction and civil engineering work.

45310000, Electrical installation work.

45232141, Heating works.

45331000, Heating, ventilation and air-conditioning installation work.

45261310, Flashing work.

45262521, Facing brickwork.

45321000, Thermal insulation work.

ADDITIONAL DETAILS

EU Funded

Yes

Suitable for SMEs

Yes

Electronic Submission

Required

Legal Basis

32014L0024

DEADLINES & TIMELINE

Submission Deadline

34 days remaining

(LOT-0001)

Published

TENDER DOCUMENTS

34 days remaining

Similar Tenders

Explore CPV 45

Conversion of a Cinema into a Municipal Theatre in Vrchlabí

Comprehensive construction work for the reconstruction, modification, and extension of the Municipal Theatre Vrchlabí, including stage expansion and new annexes for staff and administration.

Město Vrchlabí

·Vrchlabí
Deadline:August 05, 2026

Flooring works for new construction of Bad Hofgastein childcare center

Flooring works for a childcare center: subfloor preparation of screed, delivery and installation of multi-layer parquet (including on cross-laminated timber stairs), installation of skirting boards, delivery of entrance mats, and supplementary services for execution.

Marktgemeinde Bad Hofgastein

·Bad Hofgastein
Deadline:August 18, 2026
€10M

Framework Agreement: Delivery of Public Realm Infrastructure, Fingal County Council

Framework Agreement for the delivery of public realm infrastructure: includes both employer-designed and contractor-designed projects. An initial contract involves the construction of a public play space and associated ancillary works at Hazelbury Park, Dublin 15.

Fingal County Council_371

·Dublin
Deadline:August 17, 2026
PLN 66.4M

Reconstruction, Extension, and Expansion of Building 2 with Connector for Cardiology and Internal Medicine (Design-Build, Phase I: Connector Construction)

Reconstruction, extension, and expansion of Building 2 with a connector for the Cardiology Clinic and Internal Medicine Clinic in a design-build system (Phase I: construction of the connector): Execution is exclusively in 3D modular construction with a steel structure. The scope includes the development of project documentation. Finishing of the angiography labs on the second floor is the responsibility of the contractor, while finishing of the MRI lab on level -1 is by the equipment and apparatus supplier. A warranty period of at least 36 months, but not longer than 60 months, must be provided for the executed works, installed/built-in materials, delivered devices, and installations, calculated from the acceptance date of the entire order. The contractor and its subcontractors must employ physical workers directly involved in general construction work under an employment contract.

5 Wojskowy Szpital Kliniczny z Poliklinika SP ZOZ w Krakowie

·Kraków
Deadline:July 24, 2026

Find matching tenders automatically

With Patterno-HIT, receive relevant tenders daily, automatically filtered to your company profile.

Book Demo Now