New construction of Peuschen wastewater treatment plant (350 PE)
New construction of a wastewater treatment plant for 350 population equivalents (PE): site setup, documentation, civil and plant engineering including 960 m² watertight excavation pit shoring, 2,350 m³ excavation/backfill of excavation pit, 3 units dewatering wells/temporary water management, 100 m pipe trenching, 250 m cable and conduit trenches, 40 m drinking water pipe DN 25, 60 m pipe DN 150/200, 1 unit outflow structure for receiving water, 60 m pipelines DN 150 - DN 200, 1 unit reinforced concrete combined basin with 326 m³ usable volume (pre-storage, SBR reactor, excess sludge storage), 1 unit reinforced concrete sampling shaft, 1 unit reinforced concrete MID shaft, 150 m² bituminous road surfacing Bk 0.3, 340 m² concrete block paving, 90 m fence construction, 300 m² topsoil work/lawn seeding; mechanical equipment includes buffer tank, SBR reactor, sludge tank, dosing station, operations building/control room as pre-fabricated reinforced concrete building 7.00 m x 3.20 m, MID shaft, each including piping and fittings or aggregates; E-MSR technology with switching and control system, approx. 300 m cable laying, small installations, sockets, switches, fastenings, earthing and lightning protection system, remote control technology and process control technology; further items as per the tender documents.
Never miss a tender again
We send you 3 current matches that fit your company.