Skip to main content
All tenders

Track superstructure renovation for Sulzfeld train station

Status
Active
Submission Deadline
31 days remaining
Contracting authority
Albtal-Verkehrs-Gesellschaft mbH1 more open tender view
Location
Karlsruhe, Germany
Procedure
Open Procedure · Works
Category
Track construction works.
Published
Reference
ted-579767-2026

Track superstructure renovation for line 94201, Grötzingen - Eppingen, in the area of Sulzfeld train station (km 34.0+94 to km 35.3+65): fundamental renovation of tracks 1 and 2, including entry switches 101, 107, and switch 102; complete renewal of the superstructure and improvement of the load-bearing capacity of the soil layer with a binder; dismantling and disposal of the track system, removal of excavated ballast, temporary storage of switches, dismantling of cable troughs, and temporary securing of the cable system; new construction of a drainage system with deep drainage and infiltration and evaporation swales; replacement of cable crossings in the superstructure with underground crossings; renewal of cable troughs; sectional installation of edge path constructions from old rails and ballast retention plates; improvement of subgrade load-bearing capacity through flat incorporation of a lime-cement mixture; supply of B 70 and B 90 prestressed concrete sleepers, track ballast; construction of ballast track superstructure with concrete sleepers and Vignole rails; assembly and installation of 4 switches (switches, sleeper sets, and rails will be provided by the client); restoration of track coverings at crossings after completion of works. Scope of dismantling: approx. 650 m cable troughs and temporary cable securing, 4 units of switch constructions, approx. 4,200 m rails (Form 49E1 or 54E4), approx. 200 units of concrete sleepers, approx. 2,700 units of steel trough sleepers, approx. 900 units of wooden sleepers, approx. 6,000 t excavated ballast, approx. 2,300 m² topsoil removal, approx. 1,100 m³ soil removal, 2 units of track coverings in crossings. Scope of new construction: approx. 12,000 m² soil improvement with lime-cement mixture and subgrade, approx. 660 m deep drainage including inspection shafts, approx. 600 m infiltration and evaporation swales, approx. 650 cable troughs, 4 units of cable crossings in open construction including cable shafts, approx. 2,200 m ballast track superstructure with concrete sleepers and Vignole rails, 4 units of switch installation, approx. 650 m edge paths, approx. 100 m edge path construction with ballast retention plates, 2 units of covering of crossings; further items as per the tender documents.

Free

Never miss a tender again

We send you 3 current matches that fit your company.

With a number we call briefly to sharpen your search profile.

No account neededReply in 1-2 business days

By submitting, you agree that Patterno sends you matching tenders by email and, if you leave a number, calls you once about it. Revocable at any time. Privacy policy


Tender documents

  • Portal — LOT-0000NON-RESTRICTED-DOCUMENT
  • TED HTML — 579767-2026HTML
  • TED PDF — 579767-2026PDF
  • TED XML — 579767-2026XML
Free

Unlock documents for free

Enter your email address. If you confirm, we will also send you 3 similar tenders.

No account neededReply in 1-2 business days

By submitting, you agree that Patterno sends you matching tenders by email. Free, unsubscribe anytime. Privacy policy


Additional details

EU Funded
Yes
Suitable for SMEs
No
Electronic Submission
Allowed
Legal Basis
32014L0025
Live webinar

See Patterno work on a real tender

45 minutes live, questions answered in the chat. Upcoming dates on the signup page.

  • Matches from 4,500+ portals in one workspace
  • Qualify any tender against your criteria in minutes
  • Prepare bid documents from your company context

Prefer a private session?