Object Planning for Engineering Structures for the Rehabilitation of Main Collector 1.0
Object planning for engineering structures: service phases 1-9 according to §43 HOAI based on Part 3, Section 3 for the rehabilitation of main collector 1.0 of the Quierschied (234) wastewater system with a construction length of approximately 1.6 km. Measures include renovation using the liner method, renewal using open and closed construction methods, and selective repair measures.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 761257-2026HTML
- TED PDF — 761257-2026PDF
- TED XML — 761257-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.