Skip to main content
Activeted-490412-2026

Photovoltaic System for Roof Areas

Delivery and installation of photovoltaic modules: parallel installation on inclined roof areas considering monument protection requirements, including cabling work inside the building and on the roof. Modules must be in brick-red design for a homogeneous surface appearance. Rated power: approx. 25.2 kWp.

CONTRACTING AUTHORITY

Name

Staatliches Bau- und Liegenschaftsamt Rostock

City

Rostock

Country

DE

Website

CLASSIFICATION

Procedure Type

Open Procedure

Contract Type

Works

Main CPV

45261215, Solar panel roof-covering work.

Other CPV

45315300, Electricity supply installations.

ADDITIONAL DETAILS

EU Funded

Yes

Suitable for SMEs

Yes

Electronic Submission

Required

Legal Basis

32014L0024

15 days remaining

Similar Tenders

Explore CPV 45

Drywall Works for Administration Building and Library

Drywall works for two 4-story new buildings (administration building with 2,295 sqm usable area and library with 10,969 sqm usable area): Delivery and installation of interior doors, interior windows, glass system partition walls, mobile partition walls, acoustic curtains, WC partition walls, and raised access floors. For the administration building: site setup; 2,265 sqm plasterboard walls (d=10 to 15 cm), 219 sqm plasterboard double-stud walls (d=16 to 50 cm); approx. 100 sqm shaft walls F90 (d=12.5 to 15 cm), 268 sqm acoustic plasterboard pre-walls, 104 sqm perforated acoustic wall panels; 283 sqm shaft walls (d=7.5 to 12.5 cm) as pre-walls; approx. 30 sqm dry plaster; 485 m sliding ceiling connections, 405 m UA profiles (b=50 to 150 mm), 67 pieces trusses, 111 m slanted wall connections; 157 pieces door openings, 388 pieces round and 425 pieces angular openings for HVAC trades; 1,055 sqm suspended plasterboard ceilings, 1,635 sqm perforated ceilings, 134 sqm self-supporting plasterboard ceilings, 78 pieces inspection hatches; 1,354 kg square hollow profiles for installation in plasterboard walls, 240 pieces telescopic supports for installation in plasterboard walls, 96 m fire protection claddings F90 for supports; three acoustic and blackout curtains (L=approx. 6 to 10 m); 136 pieces wooden doors with HPL overlay and steel frames (with fittings), 10 pieces 1-2 leaf fire protection doors EI 30 with wooden block frames (with fittings); 14 pieces interior windows in monoblock construction (approx. 2.8 to 7 sqm); 49.5 sqm WC partition walls made of laminate composite element, 12 doors; approx. 800 sqm raised access floors F30 made of fiber-reinforced calcium sulfate material, 117 pieces inspection openings 60 x 60 cm. For the library: site setup; 7,075 sqm plasterboard walls (d=10 to 12.5 cm), 941 sqm plasterboard walls (d=15 to 20 cm), 140 sqm plasterboard double-stud walls (d=33 to 39 cm); 293 sqm shaft walls F30 to F90 (d=10 to 12.5 cm); 1,503 sqm pre-walls (d=10 cm), 1,412 sqm freestanding pre-wall on the inside of the exterior wall; approx. 400 sqm dry plaster; approx. 490 m sliding ceiling connections, 2,032 m UA profiles (b=50 to 150 mm), 249 pieces trusses, 615 m slanted wall connections, 5,370 m wall-flush mounted aluminum skirting boards; 71 pieces inspection hatches, 205 pieces door openings, 984 pieces round and 1,106 pieces angular openings for HVAC trades; 2,387 sqm suspended plasterboard ceilings, 2,795 sqm perforated ceilings, 3,074 sqm suspended; further items as per the tender documents.

Staatliches Bau- und Liegenschaftsamt Rostock

·Rostock
Deadline:August 21, 2026

Site Security and Logistics for New and Existing Buildings

Site security and logistics for two 4-story new buildings (administration building 2,295 sqm, library 10,969 sqm) and three 2-story listed existing buildings (detention building 228 sqm, exercise hall 1,004 sqm, latrine 72 sqm): monitoring and securing the construction site, control and locking of access points, documentation of incidents, hazard prevention; control of site access, coordination of deliveries, management of storage and traffic areas, management and documentation of a delivery system.

Staatliches Bau- und Liegenschaftsamt Rostock

·Rostock
Deadline:August 26, 2026

Gantry crane system for HIL new building

Installation of a gantry crane system: Installation in the HIL new building at Laage Airfield.

Staatliches Bau- und Liegenschaftsamt Rostock, die Bundesrepublik Deutschland vertretend

·Rostock
Deadline:August 31, 2026

Lightning Protection and Earthing Systems

Renewal of the external lightning protection and earthing system: Execution as a classic system with air-termination systems, down conductors, and an earthing system; integration of all metallic building components and roof structures, considering monument preservation requirements and the specific roof geometry.

Staatliches Bau- und Liegenschaftsamt Rostock

·Rostock
Deadline:September 09, 2026

Find matching tenders automatically

With Patterno-HIT, receive relevant tenders daily, automatically filtered to your company profile.

Book Demo Now