Design and Execution: TransRegio Feleac TR 35, Metropol Ring Road TR 35 and Connecting Roads, Lot 2
Design and execution for TransRegio Feleac TR 35, Phase I of Metropol Ring Road TR 35 and connecting roads, Lot 2: Section TR35 from km 14+747 (Node 5 Floresti) to the entrance of Tunnel 1 km 19+600, including Node 5 (Floresti), Node 6 (Cora), Node 7 (Colina) and Road B4 from Node 7 (Colina) to the Regional Hospital, as well as Road B4.3 from connecting road B4.2 to connecting road B4.1. The contract duration is 48 months, comprising 17 months for design and 31 months for execution.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0000NON-RESTRICTED-DOCUMENT
- TED HTML — 535613-2026HTML
- TED PDF — 535613-2026PDF
- TED XML — 535613-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.