Design and Execution of Road Works for TransRegio Feleac TR 35, Section km 19+600 to km 24+365, incl. Nodes and Tunnels
Design and execution of road works: TransRegio Feleac TR 35 – Stage I Metropolitan Beltway TR 35 and Connecting Roads – Phase I Metropolitan Beltway TR 35 and Connecting Roads, Lot 3, for road TR35 between km 19+600 and km 24+365. Included are Node 8 (Basarabiei), Node 9 (Frunzișului), Tunnels 1+2+3, and connecting road DL B8 (Tr 35 Node 9 – Frunzișului Street in the Municipality of Cluj-Napoca). The contract duration is 48 months, comprising 17 months for design and 31 months for execution.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0000NON-RESTRICTED-DOCUMENT
- TED HTML — 563033-2026HTML
- TED PDF — 563033-2026PDF
- TED XML — 563033-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.