Design and Construction Works for Tychy – Bieruń Stary Railway Line
Design and construction works for railway line no. 179 Tychy – Bieruń Stary: preparation of project documentation (executive and as-built documentation including geodesy), construction works on track and subgrade, railway traffic control systems (srk), telecommunication devices and systems, traction network with power supply, electro-energetic devices and systems up to 1 kV, engineering structures, platforms and cubature objects, crossings and passages, geology, and construction of environmental protection objects. Execution of conformity assessment for structural subsystems at all stages (design, construction, final tests) and submission of EC verification declarations and certificates. An interface option includes the optional commissioning of changes to railway traffic control system interfaces, with a duration of at least 6 months and a maximum of 4 years from option activation. The implementation period for the basic scope is 27 months from contract signing, including 22 months for the completion of all works and documentation handover, and a maximum of 8 months for the delivery of operating permits for structural subsystems. The interface option can be activated throughout the entire construction and warranty period.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 568955-2026HTML
- TED PDF — 568955-2026PDF
- TED XML — 568955-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.