Skip to main content
Activeted-483266-2026

Planning services for the development of active tourism in Miskolc Lillafüred

Planning services for the development of active tourism in Miskolc Lillafüred: Creation of a unified planning concept and coordinated permit preparation for the renovation of the lakeside promenade, the creation of a lake promenade, and the planning of a resting point and observation deck in the vicinity of Lake Hámori. The planning requires consideration of static, geotechnical, water law, traffic, nature conservation, and landscape architectural aspects. The principle of local water retention according to Government Decree 147/2010. (IV.29.) Art. 4 § (6) must be applied, as well as the method for preserving biological activity according to Natura 2000 and BNPI regulations. A minimum 36-month warranty for the entire planning documentation is required. The project affects a Natura 2000 area and the operational area of the Bükk National Park Directorate. Partial bids are not permitted.

CONTRACTING AUTHORITY

Name

Miskolc Megyei Jogú Város Önkormányzata

City

Miskolc

Country

HU

CLASSIFICATION

Procedure Type

Open Procedure

Contract Type

Services

Main CPV

71240000, Architectural, engineering and planning services.

ADDITIONAL DETAILS

EU Funded

Yes

Suitable for SMEs

Yes

Electronic Submission

Required

Legal Basis

32014L0024

DEADLINES & TIMELINE

Submission Deadline

27 days remaining

(LOT-0001)

Published

TENDER DOCUMENTS

27 days remaining

Similar Tenders

Explore CPV 71

Planning Services for Play and Sports Parks in Görömbölyi, Szirma, and Martinkertváros

Planning services and designer supervision for the development of play and sports parks in Martinkertváros, Miskolc-Szirma, and Görömböly: Preparation of complete approval and execution planning documentation for complex, multifunctional community and green space park developments. The designer's tasks include ensuring compliance with Ábtv. and ÉBFR requirements until successful technical acceptance, continuous participation in the preparation of the procurement procedure for execution (1 procedure), and answering technical inquiries. Designer supervision is optional, callable up to 8 times (each 4 engineer hours), requiring the participation of all specialist designers. The construction period is planned for 8-10 months. further items as per the tender documents.

Miskolc Megyei Jogú Város Önkormányzata

·Miskolc
Deadline:August 10, 2026

Planning Services for the Szinva Green Corridor

Planning services for the Szinva Green Corridor: Preparation of architectural-technical documentation according to Government Decree 281/2024 (IX. 30.) and compliance with the requirements of Government Decree 191/2009 (IX.15.) and the Hungarian Chamber of Engineers for execution plans. This includes conducting a climate resilience assessment, applying the DNSH principle (EU 2020/852 Article 9), implementing the water retention principle (Government Decree 147/2010), and presenting the method for preserving biological activity. Furthermore, accessibility requirements according to eÚT 03.05.12 and universal design principles must be met, visibility elements and logos integrated according to the Széchenyi Plan Plus Corporate Identity Manual and KTK Plusz guidelines, and environmental-ecological, water management, landscape architectural, and transport aspects (vehicle, bicycle, and pedestrian traffic) comprehensively considered. MSZ 12042:2023 (Tree protection on construction sites) and MSZ 12172:2019 (Planting of ornamental trees and shrubs) standards must be observed, tree planting for shading pedestrian and bicycle paths planned, native plant species used, invasive species excluded, and near-natural habitats created. Consultation with the Bükk National Park Directorate (BNPI) regarding stream revitalization and green infrastructure is required. Technical plans for cycling facilities must be prepared according to e-UT 03.04.13:2019 and reviewed by the Plan Jury of the Prime Minister's Office Active Mobility Department. A road safety audit according to Government Decree 133/2022 is necessary for cyclist-friendly developments. Design data for cycling facilities must be provided to the Cycle Path Registration System (KeNyi), and information and direction signs as well as cycling route signage systems planned according to e-UT 03.04.13:2019 8.4. For playground development, at least one shaded area and water access must be provided. A detailed tree survey and cadastre must be prepared, and interventions for the protection of existing vegetation (tree care, tree protection, root protection) planned in compliance with MSZ 12042:2019 and MSZ 12172:2019. Public lighting in green areas must be designed exclusively light pollution-free. A preliminary heritage protection authority inquiry must be conducted, its results documented, and, if necessary, the costs and schedule for preventive archaeological excavation integrated into the plan; further items as per the tender documents.

Miskolc Megyei Jogú Város Önkormányzata

·Miskolc
Deadline:August 05, 2026

Planning for the comprehensive development of Miskolc Main Square

Creation of comprehensive approval and execution plans for the "Sustainable Urban Development" project in Miskolc. This includes compliance with all legal requirements and support during tender procedures.

Miskolc Megyei Jogú Város Önkormányzata

·Miskolc
Deadline:July 23, 2026

Planning Services for the "Green Ring" Traffic Circle in Miskolc

A planner is sought to prepare and conduct a tender for the "Green Ring" traffic circle in Miskolc. This includes creating tender documents and answering technical questions.

Miskolc Megyei Jogú Város Önkormányzata

·Miskolc
Deadline:July 22, 2026

Find matching tenders automatically

With Patterno-HIT, receive relevant tenders daily, automatically filtered to your company profile.

Book Demo Now