Skip to main content
Activebkms-ef-fca434bd-57ff-4ad0-acab-aa4914d2d8cc

Real-world Laboratory for Energy Monitoring and Management in Residential Buildings

Investigation of energy monitoring and management in residential buildings: Execution of a real-world laboratory for practical research into the opportunities and challenges of digital measurement, control, and regulation technology (MCR technology) for heat and electricity consumption. The real-world laboratory supports technical laypersons in the research, installation, and use of MCR technology and digital monitoring to develop best practice approaches for various user groups and building types.

CONTRACTING AUTHORITY

Name

Umweltbundesamt

City

Dessau-Roßlau

Country

DE

CLASSIFICATION

Procedure Type

de-open

Contract Type

Services

ADDITIONAL DETAILS

Legal Basis

de-hhr

DEADLINES & TIMELINE

Submission Deadline

43 days remaining

(LOT-0000)

Published

TENDER DOCUMENTS

43 days remaining

Similar Tenders

Indicator Development and Assessment of Water Health using Environmental Specimen Bank Data

Development of indicators and an integrated One Health approach for assessing water health: Creation of meaningful methods for spatial and trend comparisons of water bodies, their evaluation, visualization, and description in an online-based dashboard. The project utilizes environmental data from the Environmental Specimen Bank (UPB) and has conceptual interfaces with the UPB's TrendDNA project (2026-29). Direct comparisons between chemical contamination of human collectives and UPB environmental samples are excluded. The service includes the following work packages: project management, communication, and detailed concept; investigation concept for indicator derivation and statistical utilization of UPB data; evaluation and data scientific analysis; dashboard development; analysis of pathogens in UPB samples; synthesis and knowledge transfer, including reporting.

Umweltbundesamt

·Dessau-Roßlau
Deadline:August 11, 2026

HBM Analysis of Flame Retardants for PARC Studies

Service in the field of human biomonitoring (HBM) analytics for determining the corporal exposure of the population to flame retardants. Specifically, this involves the chemical analysis of approx. 570 serum samples for the flame retardant HBCDD and approx. 850 urine samples for the flame retardant TDCPP (or its metabolite BDCPP). The analysis must be carried out using tested standard methods or validated laboratory procedures.

Umweltbundesamt , Referat Z 1.5

·Dessau-Roßlau
Deadline:August 12, 2026

Decommissioning of Wind Turbines and Site Reuse in Repowering

Planning and execution of a research project on the topic "Decommissioning of wind turbines - re-use of areas, re-use of sites, infrastructure and material in the context of repowering". The service includes the scientific investigation and evaluation of aerial and satellite images, the creation of case studies and expert interviews, and the derivation of recommendations for action. This is a scientific service in the field of environmental research and resource protection with a duration of 30 months.

Umweltbundesamt

·Dessau-Roßlau
Deadline:August 11, 2026

Environmentally Friendly Aquathermy: Guidelines for Surface Waters

Planning and execution of a scientific research project on the water protection-compatible design of energetic interventions by aquathermy systems in surface waters (Aqua-Tec). The service includes systematic research, development of a multi-criteria evaluation matrix as an open-source program with a database, and derivation of best practices, orientation values, and a tiered monitoring concept. The focus is on the ecological risk assessment of heat extraction and supply in flowing, standing, and coastal waters.

Umweltbundesamt

·Dessau-Roßlau
Deadline:July 17, 2026

Find matching tenders automatically

With Patterno-HIT, receive relevant tenders daily, automatically filtered to your company profile.

Book Demo Now