Reconstruction of Tram Line Táboritská – Seifertova
Notice title: RTT Táboritská – Seifertova, výběr zhotovitele stavby
Reconstruction of a tram line with a length of 2.447 km in the streets Táboritská, Seifertova, and Jičínská: The existing tram line on large-panel slabs in Seifertova and Táboritská streets will be replaced by a concrete slab construction with W-tram fastening and asphalt surfacing. In Táboritská Street, in the section from Ondříčkova Street (excluding intersections) to before the intersection with Prokopova Street (excluding intersections), the W-tram construction will be covered with a paved surface. In Olšanská Street, the line will be connected to the existing track bed with an open superstructure. The existing tram line in Jičínská Street on a concrete slab with metro fastening and stone paving will be replaced by a concrete slab construction with W-tram fastening and asphalt surfacing. At the connection point to the existing tram track behind the intersection with Lucemburská Street, the tram surfacing will be made of stone paving. Also included are the construction of all associated technologies and equipment, the reconstruction of roadways and sidewalks, necessary relocations of utility networks, and other construction modifications according to the project documentation. Part of the project is the implementation of a cable network from the substation at Kostnické náměstí in individual branches: Towards the city center, cables will be routed through Husinecká, Krásova, Seifertova streets up to the switch point at the intersection with Italská Street; from the city center, the installation will take place in Štítného, Cimburkova, Seifertova, and Táboritská streets. The cable installation will end with connections to the joined cables at the level of ZDS Lupáčova in Táboritská Street. The cable route will predominantly follow the existing route and partly a new route, especially in connection with the coordination of the RTT Seifertova - Táboritská construction. Part of the service includes the completion of the execution documentation (RDS) and the as-built documentation (DSPS). Also included are all auxiliary and associated activities such as the provision of attestations, tests, inspection reports, UTZ protocols, certificates of competence, and other specified documents, as well as assistance in obtaining permits for trial operation and final acceptance.
Missed this tender?
This deadline has passed. So it does not happen again: we send you 3 current matches that fit your company.
Tender documents
- Restricted — LOT-0001RESTRICTED-DOCUMENT
- TED HTML — 535424-2026HTML
- TED PDF — 535424-2026PDF
- TED XML — 535424-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.