Tram Line Reconstruction Táboritská – Seifertova

Status
Active
Submission Deadline
18 days remaining
Contracting authority
Dopravní podnik hl. m. Prahy, akciová společnost13 more open tenders view
Location
Praha - Vysočany, Czechia
Estimated Value
CZK 807,120,295
Procedure
Open Procedure · Works
Category
Tramway works.Tramway platforms construction work.Tramline construction works.
Published
Reference
ted-561139-2026

Reconstruction of a tram line with a length of 2.447 km in Táboritská, Seifertova, and Jičínská streets: The existing tram track on large-area panels in Seifertova and Táboritská will be replaced by a concrete slab construction with W-tram fastening and asphalt cover. In Táboritská street, in the section from Ondříčkova street (excluding intersections) up to the intersection with Prokopova street (excluding intersections), the W-tram construction will be covered with a paved surface. In Olšanská street, the track will be connected to the existing track bed with an open superstructure. The existing tram track in Jičínská street on a concrete slab with metro fastening and stone paving will be replaced by a concrete slab construction with W-tram fastening and asphalt cover. At the connection to the existing tram track behind the intersection with Lucemburská street, the tram cover will be made of stone paving. Includes the construction of all associated technologies and equipment, reconstruction of roadways and sidewalks, necessary relocation of utility networks, and other construction modifications according to project documentation. Also included is the implementation of a cable network from the substation at Kostnické náměstí in individual branches. Cables will be routed towards the city center via Husinecká, Krásova, Seifertova up to the switch crossing with Italská street. From the city center, the implementation will take place in Štítného, Cimburkova, Seifertova, and Táboritská streets. Cable work will conclude with connections to the joined cables at the level of ZDS Lupáčova in Táboritská street. The cable route will predominantly follow the existing route and partly be new, especially in connection with the coordination of the RTT Seifertova - Táboritská construction. The scope also includes the finalization of the detailed design documentation (RDS) and the as-built documentation (DSPS). All auxiliary and associated activities, such as obtaining attestations, tests, revision reports, UTZ protocols, qualification certificates, and other specified documents, as well as providing assistance in obtaining trial operation permits and occupancy permits, are part of the service.

Free

Never miss a tender again

We send you 3 current matches that fit your company.

With a number we call briefly to sharpen your search profile.

No account neededReply in 1-2 business days

By submitting, you agree that Patterno sends you matching tenders by email and, if you leave a number, calls you once about it. Revocable at any time. Privacy policy


Tender documents

  • Restricted — LOT-0001RESTRICTED-DOCUMENT
  • TED HTML — 561139-2026HTML
  • TED PDF — 561139-2026PDF
  • TED XML — 561139-2026XML
Free

Unlock documents for free

Enter your email address. If you confirm, we will also send you 3 similar tenders.

No account neededReply in 1-2 business days

By submitting, you agree that Patterno sends you matching tenders by email. Free, unsubscribe anytime. Privacy policy


Additional details

Electronic Submission
Required
Legal Basis
32014L0025
Live webinar

See Patterno work on a real tender

45 minutes live, questions answered in the chat. Upcoming dates on the signup page.

  • Matches from 4,500+ portals in one workspace
  • Qualify any tender against your criteria in minutes
  • Prepare bid documents from your company context

Prefer a private session?