Shell Construction Works for the New Europagymnasium Kerpen
Shell construction works for the new Europagymnasium Kerpen: Engineering services for site setup, BBQ concept, precast reinforced concrete elements, exposed concrete elements, waterproof concrete, composite beams, detailed scheduling; surveying for excavation pit and structure; construction of 2,000 m² asphalted construction road and 8,000 m² gravelled site setup area; earthworks for excavation pit with sloped walls as residual excavation up to fine grading, removal, transport, disposal or recycling of 250 m³ soil (backfill HB 1), 4,200 m³ soil (loess loam HB 2), 3,000 m³ soil (Pleistocene terrace HB 3); creation of 10,000 m² fine grading; removal and disposal of 570 m drainage pipes (farmland); creation of 870 m³ trenches for foundation pipes including fine grading and shoring; open dewatering; civil engineering works for building drainage with excavation of 700 m³ trench, 780 m² trench shoring, 180 m sewage and rainwater pipe PP including joint and fittings, 8 precast manholes DN 400 PP including manhole covers, 17 reinforced concrete manholes DN 1000 including manhole covers; foundation pipes: 200 m rainwater drainage pipe DN 110 to DN 220 PP-MD including bends, connectors, branches; 770 m sewage drainage pipe DN 110 to DN 160 PP-MD including bends, connectors, branches; 55 floor penetrations with wall collars; 10 wall penetrations with sealing inserts; 50 floor drains; electrical conduits: 6,000 m electrical installation pipe including draw wire and device connection boxes; earthing system: 10,000 m connecting lines stainless steel and galvanized including connecting elements; building penetrations: 7 electrical cable entries, 7 plumbing-heating wall penetrations; waterproofing and perimeter insulation: 2,300 m² vertical building waterproofing bitumen sheets W2.2E school building, 980 m² vertical building waterproofing bitumen sheets W2.2E ventilation ducts, 1,250 m² horizontal building waterproofing bitumen sheets W2.2E ventilation ducts, 8,700 m² horizontal building waterproofing with fresh concrete composite system school building, 7,150 m² XPS perimeter insulation horizontal, 650 m² CFG perimeter insulation horizontal, 2,250 m² XPS perimeter insulation vertical, 40 m² CFG perimeter insulation vertical; in-situ concrete works: 14,700 m² blinding layer, 2,570 m³ individual and strip foundations, 5,350 m³ waterproof concrete floor slabs, 2,550 m³ reinforced concrete floor slabs, 193 m³ reinforced concrete parapet, 490 m³ waterproof concrete exterior walls, 1,280 m³ reinforced concrete exterior walls, 3,200 m³ reinforced concrete interior walls including stairwell and shaft walls, 155 reinforced concrete exterior columns, 511 reinforced concrete interior columns, 2,630 m³ reinforced concrete roof slab, 9,180 m³ reinforced concrete slab, 2,830 m³ reinforced concrete beams, including exposed concrete requirements, built-in parts, and reinforcement; precast concrete elements: 75 precast stair flights, 3 cover plates for access openings; masonry works: 2,740 m² non-load-bearing sand-lime brick masonry; painting works in technical areas in the basement: 3,040 m² surface hardening of floor slab, 3,920 m² wall and column coating with dispersion paint, 3,040 m² ceiling coating with dispersion paint, 2,670 m² coating of ventilation ducts (concrete).
CONTRACTING AUTHORITY
CLASSIFICATION
Procedure Type
Open Procedure
Contract Type
Works
Main CPV
45223220, Structural shell work.
Other CPV
45262311, Concrete carcassing work.
ADDITIONAL DETAILS
EU Funded
Yes
Suitable for SMEs
Yes
Electronic Submission
Required
Legal Basis
32014L0024
DEADLINES & TIMELINE
Submission Deadline
50 days remaining(LOT-0001)
Published