Shell Construction Works for the New Europagymnasium Kerpen
Shell construction works for the new Europagymnasium Kerpen: Engineering services for site setup, BBQ concept, precast reinforced concrete elements, exposed concrete elements, waterproof concrete, composite beams, detailed scheduling; surveying for excavation pit and structure; construction of 2,000 m² asphalted construction road and 8,000 m² gravelled site setup area; earthworks for excavation pit with sloped walls as residual excavation up to fine grading, removal, transport, disposal or recycling of 250 m³ soil (backfill HB 1), 4,200 m³ soil (loess loam HB 2), 3,000 m³ soil (Pleistocene terrace HB 3); creation of 10,000 m² fine grading; removal and disposal of 570 m drainage pipes (farmland); creation of 870 m³ trenches for foundation pipes including fine grading and shoring; open dewatering; civil engineering works for building drainage with excavation of 700 m³ trench, 780 m² trench shoring, 180 m sewage and rainwater pipe PP including joint and fittings, 8 precast manholes DN 400 PP including manhole covers, 17 reinforced concrete manholes DN 1000 including manhole covers; foundation pipes: 200 m rainwater drainage pipe DN 110 to DN 220 PP-MD including bends, connectors, branches; 770 m sewage drainage pipe DN 110 to DN 160 PP-MD including bends, connectors, branches; 55 floor penetrations with wall collars; 10 wall penetrations with sealing inserts; 50 floor drains; electrical conduits: 6,000 m electrical installation pipe including draw wire and device connection boxes; earthing system: 10,000 m connecting lines stainless steel and galvanized including connecting elements; building penetrations: 7 electrical cable entries, 7 plumbing-heating wall penetrations; waterproofing and perimeter insulation: 2,300 m² vertical building waterproofing bitumen sheets W2.2E school building, 980 m² vertical building waterproofing bitumen sheets W2.2E ventilation ducts, 1,250 m² horizontal building waterproofing bitumen sheets W2.2E ventilation ducts, 8,700 m² horizontal building waterproofing with fresh concrete composite system school building, 7,150 m² XPS perimeter insulation horizontal, 650 m² CFG perimeter insulation horizontal, 2,250 m² XPS perimeter insulation vertical, 40 m² CFG perimeter insulation vertical; in-situ concrete works: 14,700 m² blinding layer, 2,570 m³ individual and strip foundations, 5,350 m³ waterproof concrete floor slabs, 2,550 m³ reinforced concrete floor slabs, 193 m³ reinforced concrete parapet, 490 m³ waterproof concrete exterior walls, 1,280 m³ reinforced concrete exterior walls, 3,200 m³ reinforced concrete interior walls including stairwell and shaft walls, 155 reinforced concrete exterior columns, 511 reinforced concrete interior columns, 2,630 m³ reinforced concrete roof slab, 9,180 m³ reinforced concrete slab, 2,830 m³ reinforced concrete beams, including exposed concrete requirements, built-in parts, and reinforcement; precast concrete elements: 75 precast stair flights, 3 cover plates for access openings; masonry works: 2,740 m² non-load-bearing sand-lime brick masonry; painting works in technical areas in the basement: 3,040 m² surface hardening of floor slab, 3,920 m² wall and column coating with dispersion paint, 3,040 m² ceiling coating with dispersion paint, 2,670 m² coating of ventilation ducts (concrete).
Kolpingstadt Kerpen
·Kerpen