Vibrated Clinker Flooring for Fire Department Technical Center
Installation of vibrated clinker flooring for a fire department technical center: substrate shot blasting approx. 2,580 m², bonding bridge approx. 2,580 m², floor covering in mortar bed approx. 2,580 m², creation of slopes to channel bodies approx. 1,600 m², guiding strips made of different colored tiles approx. 1,930 m, plinth approx. 345 m, adaptation of floor covering to channel bodies approx. 400 m, two-row stainless steel anchor plates in driving lane areas approx. 225 m², angle steel profiles in gate areas 100/75/8 mm approx. 135 m. The new construction of the FTZ in Lemke includes approx. 8,200 m² usable area and approx. 9,140 m² outdoor areas.
Never miss a tender again
We send you 3 current matches that fit your company.
Tender documents
- Portal — LOT-0001NON-RESTRICTED-DOCUMENT
- TED HTML — 599887-2026HTML
- TED PDF — 599887-2026PDF
- TED XML — 599887-2026XML
Unlock documents for free
Enter your email address. If you confirm, we will also send you 3 similar tenders.